The Public Works Committee left several street-safety and maintenance rules unresolved, asking staff to bring back proposed changes on dumpsters and pavement repairs. It also asked for a full City Council presentation on a possible state-led redesign of 22nd Street.
Key Decisions
The committee asked staff to draft changes to the dumpster-in-the-street rules after a hauler said it already uses reflective tape. The city’s current code refers to director-approved tape standards, but staff said no such standard is known to exist; the proposed rewrite is expected back in January.
A possible Wisconsin DOT project could narrow 22nd Street from four lanes to two lanes with a center turn lane, updated accessible curb ramps and a pedestrian crossing beacon at Jackson Street. The committee asked for the full Council to hear a presentation; the project, if it moves ahead, is tentatively targeted for 2029-30.
The committee asked staff to write the city’s first formal pavement-repair policy. Staff said current repair practices rely on personal knowledge of industry standards and may not be applied consistently.
Public Input
No public comments or communications recorded for this meeting.
Agenda Items
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Sandy Bay Highlands Phase 3 update
Sanitary sewer, water and storm-sewer work had been installed in the first part of the subdivision. Rain and the holiday weekend delayed grading and gravel work; the contractor hoped to finish that portion by the end of the first week of December before returning to underground utility work.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Fall Leaf Collection Update
The official leaf-collection season ended November 27, but crews made multiple citywide sweeps after residents put out substantial additional leaves over the holiday weekend. Public Works reported collecting 163 loads, or 3,032 cubic yards, before removing collection equipment from trucks for winter preparation.
Harbor Street, 16th Street and Emmet Street 2025 Reconstruction - Update
The 2025 reconstruction project was in survey and design. Staff said Harbor and 16th streets are identified as an on-street bike route in the city’s 2013 bicycle and pedestrian plan, so engineering will examine how that affects the street design and bring alternatives to the January committee meeting.
PROPERTY OWNER REQUESTS — 23rd Street Sidewalk Extension at East River Street (11/4/24 council meeting)
The committee concluded pedestrians can already travel from East River Street to the north side of 23rd Street using the existing route. It determined no further action was needed, although staff noted vegetation makes it unclear whether the existing sidewalks connect and whether a formal curb ramp exists at the northeast corner.
PROPERTY OWNER REQUESTS — Widening Sidewalks (multiuse trails) for Improved Bicycle Accommodation (11/4/24 council meeting)
Staff reviewed recommendations in the city’s 2013 bicycle and pedestrian plan, including shared-use paths, on-street bike accommodations and improved crossings. Some future street changes could reduce parking from both sides of a street to one side, but the minutes record no committee action on a specific project.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Sidewalk Maintenance Clearance Requirements
Referred
Staff sought direction after the City Council sent proposed changes to the sidewalk-maintenance code back to the committee for more revisions. Staff said there was no immediate deadline because snow and ice removal is covered elsewhere in city code.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Dumpster Permit Requirements
The committee revisited safety requirements for dumpsters placed in streets. Staff said the code allows director-approved reflective tape, but neither the director nor staff knew of an approved city tape standard; the intended protection has been Type II barricades with reflective material and flashing lights from 4 p.m. to 8 a.m. Fred Radandt said his company uses reflective tape on dumpster ends and sides and would add more if the city requires it. Staff will use his sketches to draft ordinance and permit changes for committee review in January.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Pavement Repair Policy
Staff said Two Rivers has no formal written policy for pavement repairs and patching, relying instead on personal knowledge of industry practices that may not be used consistently. The committee asked engineering staff to prepare a draft policy that could account for pavement age, material, traffic loads, curb-and-gutter type and pavement condition.
COMMITTEE AND COUNCIL MEMBER ITEMS FOR DISCUSSION, INCLUSION IN FUTURE AGENDA AND ACTION, IF NEEDED
Bill LeClair asked whether the city should investigate a snow-melting machine. Public Works Director Matthew Heckenlaible said such equipment is generally used where snow-storage space is scarce and snow volumes are high, and said he did not believe Two Rivers needs to investigate it.
OTHER ITEMS THAT MAY COME BEFORE THE COMMITTEE: CONSIDERATION AND ACTION, IF NEEDED — Snow Season 1
Staff was preparing snow equipment, marking storm inlets and planning to place sand barrels. New trucks had passed inspection with minor issues to be fixed before delivery, but the city was still waiting for mounted equipment before Monroe Trucking could finish its work; staff hoped the trucks would arrive by month’s end.
22nd Street (Lincoln Avenue to Forest Avenue) WDOT potential project
Wisconsin DOT contacted city engineering about a possible future project to convert 22nd Street from four lanes to two lanes with a center two-way left-turn lane. The concept also includes possible accessible curb-ramp upgrades and rectangular rapid-flashing beacons at Jackson Street. The committee suggested a presentation to the full City Council at its December 23 work session; if pursued, the project would be slated for 2029-30.