Roosevelt Avenue residents faced continued access limits through September as paving moved ahead, while the committee left several street-policy questions unresolved.
Key Decisions
Roosevelt Avenue reconstruction reached the paving stage, but vehicle access along the street was expected to remain unavailable during paving and curing, likely through September. Residents were told to bring garbage and recycling to the nearest intersection for collection.
The committee discussed how much grass or other material may extend onto sidewalks and whether the city could face liability under its broad sidewalk-maintenance language. The city engineer was to seek legal feedback before the issue moves further.
Staff said new parking restrictions would not solve Neshotah Road’s busy-weekend parking problems because the reported issues involve people already ignoring existing rules. The recommendation was to leave the rules unchanged.
Public Input · 1 speaker
Bill LeClairrelayed constituent feedback
LeClair relayed a public question about whether Neshotah Road should be reconstructed instead of repeatedly patched. Engineering said the issue had recently been discussed and would need coordination with the Town of Two Rivers.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Sandy Bay Highlands Phase 3 Update
The contractor was submitting preconstruction materials for engineering review, and staff was arranging a preconstruction meeting. Construction was expected to start September 16, with an initial portion targeted for completion by November 15 and the rest by June 2025.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Roosevelt Avenue Reconstruction Update
Underground utility work, grading, graveling and mainline concrete placement had been completed. Staff expected curb and parking lanes to be placed in early September, followed by sidewalk and driveway replacement. Vehicle access along Roosevelt Avenue was expected to be unavailable during paving and curing, likely through September; residents were directed to take garbage and recycling to the nearest intersection.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Washington Street Bridge - Pedestrian Accommodation Update
The Department of Public Works planned to begin the pedestrian-accommodation project September 12. Staff expected the work to take the rest of the month.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Browns Drive Curb and Gutter Installation
The Department of Public Works had completed most curb-and-gutter work. The section by the new Braun’s Truss plant driveway was to be finished later in the fall while staff coordinated with the contractor on site.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Madison Street Parapet Wall Repair Update
Engineering said Manitowoc County was reconsidering repair options for the west parapet wall after concerns about foam on the abutments. The county continued to describe the wall repair as non-structural, but no repair schedule was reported.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — WDOT Small Bridge/Culvert Inventory Update
Staff said state guidance for the small bridge and culvert inventory had been available since February, though the city had not received further county contact until after staff found it. What began as 15 possible locations had narrowed to zero to two. Engineering planned to inspect possible sites in September and provide a final update the following month.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Sidewalk Maintenance Clearance Requirements
Parks, Recreation and Forestry Director Mike Mathis said the city has clear rules for overhanging trees and shrubs, including notice and billing property owners if city crews must correct the problem. He said the rule on grass growing onto sidewalks is less clear, so staff has relied on the broader requirement to keep sidewalks safe. Committee members discussed allowing up to two inches of encroachment and using a five-day compliance notice, while the city engineer was to ask city attorneys whether the current language creates liability concerns.
DISCUSS STAFF RECOMMENDATIONS (TRAFFIC AND PARKING CONTROL) - ACTION, ENDORSEMENT OR MODIFICATIONS, AS NEEDED — Neshotah Road Parking Concerns
Protective services reported parking concerns on busy, hot weekends. Staff said additional restrictions would not address the problem because people were already violating existing restrictions, and recommended leaving the current rules in place.
DISCUSS STAFF RECOMMENDATIONS (TRAFFIC AND PARKING CONTROL) - ACTION, ENDORSEMENT OR MODIFICATIONS, AS NEEDED — Review with Possible Action - Parking Ordinance Language
The committee briefly discussed possible parking-rule changes affecting truck and trailer parking on city streets. Scott Stechmesser said it did not appear to be a high priority, and staff could bring the issue back as time allows.
DISCUSS STAFF RECOMMENDATIONS (TRAFFIC AND PARKING CONTROL) - ACTION, ENDORSEMENT OR MODIFICATIONS, AS NEEDED — 22nd Street and Monroe Street Stop Sign Concerns 1
Staff reported that new 36-inch stop-sign blanks had been ordered for the 22nd Street and Monroe Street concern.