street reconstruction projects
Street reconstruction, paving, utilities, sidewalks, drainage, and special assessments.
What to Watch
Watch for confirmation that the 2026 resurfacing work was completed, final assessment notices and amounts, and the 2027 budget's effect on future street and utility projects.
Coming Up
The Story
MCC was expected to finish resurfacing work on Emmet, 18th and 19th streets in early October, with final assessment bills expected soon afterward. The project also included patches on Harbor and Lake streets; affected owners should watch for their bill and payment information. Citywide, Public Works says ongoing street and utility work is competing with storm-damage and disposal costs as the city prepares its 2027 budget.
Key Decisions
-
passed 9-0 City Council · Jul 20, 2026 26-140 Contract 4-2026 for Community Investment Project for Asphalt Paving on Emmet, 18th, and 19th Streets to MCC, Inc. in the Amount Not-to-Exceed $304,540.14
Motion to award the contract to MCC, Inc., of Appleton, based on its lowest qualified bid, for an amount not to exceed $304,540.14
Mark Bittner YesAdam Wachowski YesTim Petri YesDarla LeClair YesBill LeClair YesShannon Derby YesKatherine Dahlke YesDoug Brandt Yes -
passed 9-0 City Council · Jul 20, 2026 26-139 Final Resolution Authorizing Special Assessments for Asphalt Resurfacing: Emmet street, from 17th Street to 22nd Street, 18th Street, from Jackson Street to Emmet Street, and 19th Street, from Jackson Street to Emmet Street
Motion to waive reading and adopt the resolution
Mark Bittner YesDoug Brandt YesKatherine Dahlke YesShannon Derby YesBill LeClair YesDarla LeClair YesTim Petri YesAdam Wachowski Yes -
passed 9-0 City Council · Jun 15, 2026 26-118 Preliminary Resolution for Special Assessment for 18th and 19th Streets from Jackson to Emmett Streets, then Emmett Street from 17th to 22nd Streets
Motion to waive reading and adopt the resolution (Preliminary Resolution for Special Assessment for 18th and 19th Streets from Jackson to Emmett Streets, then Emmett Street from 17th to 22nd Streets).
Mark Bittner YesDoug Brandt YesKatherine Dahlke YesShannon Derby YesBill LeClair YesDarla LeClair YesTim Petri YesAdam Wachowski Yes -
passed City Council · Feb 16, 2026 26-027 Award of bid for Contract 2-2026, Lateral Replacement Program, scattered locations on the City's near north side
Motion to award the contract to Mammoth Construction LLC of Manitowoc, based on its lowest qualified bid, in the amount of $2,437,152.60
-
passed 8-0 City Council · Sep 2, 2025 25-175 Award of bid for contract 6-2025: Curb & Gutter and Paving (Sandy Bay Highlands Subdivision No. 3)
Motion to award the contract to Vinton Construction Company of Manitowoc, based on its lowest qualified bid, in the amount of $342,593.90
Mark Bittner YesDarla LeClair YesAdam Wachowski YesTim Petri YesDoug Brandt YesBill LeClair YesShannon Derby Yes -
passed 8-0 City Council · Mar 3, 2025 25-040 Preliminary Resolution to Levy Special Assessments for the Harbor Street from Pilon Court to 16th Street, 16th Street from Harbor Street to Emmet Street and Emmet Street from 16th Street to 17th Street Reconstruction Project 2 Recommended Action:
Motion to waive reading and adopt the resolution.
Mark Bittner YesDoug Brandt YesShannon Derby YesBill LeClair YesDarla LeClair YesTim Petri YesAdam Wachowski Absent
Record
-
The Public Works Committee kept proposed reconstruction of 19th Street from East River Street to Jefferson Street and East River Street from 19th Street to vacated 18th Street on hold while awaiting information about the confluence project.
Public Works Committee -
Staff reported Roosevelt Avenue sanitary-sewer work was partly complete, about half the water main had been installed, and storm-sewer work at 12th Street was next; driving lanes were to be paved there to keep traffic moving.
Public Utilities Committee -
Staff said Roosevelt Avenue utility work included replacing about 12 poles and transferring power to the new poles.
Public Utilities Committee -
Staff reported sanitary sewer and water-main work on Roosevelt Avenue had been installed and tested from 12th Street south of 9th Street; water services, storm sewer near 12th Street, sanitary laterals and pavement removal remained.
Public Utilities Committee -
Staff reported the Roosevelt Avenue sanitary sewer main was complete and expected water-main work to finish during the week of July 8 before crews moved to the main storm sewer.
Public Utilities Committee -
The city reported Roosevelt Avenue sanitary sewer, water-main work, private sewer laterals and water services were complete; storm-sewer work was underway, followed by grading, gravel and paving.
Public Utilities Committee -
The city said voters would be able to cross Roosevelt Avenue at Hawthorne Street on Aug. 13 to reach the Abundant Life Church polling place, with signs directing them to the crossing.
Public Utilities Committee -
The Public Works Committee received the same Roosevelt Avenue update: utility work was complete, storm-sewer work was underway, and the city planned voter access and directional signs for the Aug. 13 election.
Public Works Committee -
Staff reported Roosevelt Avenue underground utility work had finished, followed by grading, graveling and mainline concrete placement; curb and parking-lane work was expected the following week.
Public Utilities Committee -
Affected Roosevelt Avenue residents were told to bring garbage and recycling to the nearest intersection for collection for several weeks.
Public Utilities Committee -
The Public Works Committee reported Roosevelt Avenue mainline concrete work was complete; paving, curing, sidewalk and driveway work remained, and vehicle access was expected to be unavailable through September.
Public Works Committee -
Staff said Roosevelt Avenue mainline and intersection concrete work was complete, with sidewalks, curb ramps, carriage walks and driveway approaches still being installed; reopening was expected in mid-October after signs and pavement markings were restored.
Public Works Committee -
Staff expected Roosevelt Avenue to finish within one to two weeks after final concrete pavement, topsoil, sod, signs and pavement markings.
Public Utilities Committee -
Staff described planned 2025 reconstruction of Harbor, Emmet and 16th streets, including a connection between the 12-inch water-main river crossing and the 12-inch main at 17th Street.
Public Utilities Committee -
Staff reported Roosevelt Avenue construction was complete except for cleanup and punch-list work; assessment letters had been sent to affected property owners and invoices for private services were expected.
Public Works Committee -
Harbor Street, 16th Street and Emmet Street reconstruction remained in survey and design. The committee discussed either a one-way Harbor Street with a 10-foot south-side trail or a 28-foot two-way street with bicycle markings.
Public Utilities Committee -
The committee noted Harbor Street and 16th Street are designated on-street bicycle routes in the city's 2013 Bike and Pedestrian Plan, and a builder provided information about two proposed Emmet Street homes.
Public Utilities Committee -
The Public Works Committee reported Pierce Street between 21st Street and Zlatnik Drive had completed survey work, while concepts and design still needed to be developed.
Public Works Committee -
Staff said Harbor Street was planned as a 28-foot-wide, two-way street with bicycle sharrows. A public information meeting focused largely on Harbor Street's pavement layout and bicycle accommodations.
Public Utilities Committee -
Staff said the Harbor, 16th and Emmet streets project was expected to go to bid and then pause while the city sought clarification about funding affected by a presidential executive order.
Public Utilities Committee -
City Council adopted a preliminary resolution to begin special assessments for reconstruction of Harbor Street from Pilon Court to 16th Street, 16th Street from Harbor Street to Emmet Street, and Emmet Street from 16th Street to 17th Street.
City Council -
Staff said the Harbor, 16th and Emmet streets projects had been put out for bids, with bids to open March 20. Possible Wisconsin Department of Natural Resources funding had not yet been confirmed, and staff planned to wait until late April for an award so the assessment process could occur.
Public Utilities Committee -
Engineering reported DNR funding for Harbor, 16th and Emmet streets was relatively certain and bids were favorable. Staff prepared assessment rates, rolls and notices for an April 21 public information meeting and City Council hearing, followed by a planned award to Vinton Construction.
Public Works Committee -
Engineering was scheduled to receive Pierce Street reconstruction bids April 3, with a possible City Council contract award April 7 if bids were favorable.
Public Works Committee -
The City Council unanimously awarded Vinton Construction Company of Manitowoc a $1,531,442.38 contract for reconstruction of Harbor Street, 16th Street and Emmet Street.
City Council -
The April 21 City Council agenda included a public hearing and proposed final special-assessment resolution for reconstruction-related work on Harbor Street, 16th Street and Emmet Street.
City Council -
Staff reported contracts for Harbor, 16th and Emmet streets were still being executed and the anticipated construction start had moved to mid- to late July because of the bidding and award timeline.
Public Utilities Committee -
Staff said the revised Harbor, 16th and Emmet streets schedule should still allow the required work to be completed.
Public Utilities Committee -
The Public Works Committee received the same update that Harbor, 16th and Emmet streets construction was expected to start in mid- to late July after contract execution.
Public Works Committee -
Staff said Harbor, 16th and Emmet streets construction was tentatively scheduled to begin around July 21 and finish by mid-October, allowing restoration before winter and before assessments were sent.
Public Works Committee -
Pierce Street reconstruction began June 4 after an archaeological study required for a stewardship grant delayed the work.
Public Works Committee -
City Council approved a $2,437,152.60 contract with Mammoth Construction for lead water-service and sanitary-lateral replacement at scattered near-north-side locations, generally from 23rd to 31st streets east of Forest Avenue to the East Twin River.
City Council -
The near-north-side lateral-replacement contract included 230 public-side water services, 160 private-side water services and 100 public-side sanitary laterals. Public Works was to complete pavement restoration, with reimbursement planned through Wisconsin Department of Natural Resources funding.
City Council -
City Council unanimously approved a preliminary resolution to begin the special-assessment process for resurfacing 18th and 19th streets from Jackson to Emmet streets and Emmet Street from 17th to 22nd streets. Bids were scheduled to open June 29.
City Council -
At the public hearing, Keralee Miedaner objected to special assessments, saying the work was routine maintenance that would not increase property values.
City Council -
City Council unanimously adopted the special-assessment roll for the 2026 resurfacing project on Emmet Street from 17th to 22nd streets and on 18th and 19th streets between Jackson and Emmet streets. The estimated assessable cost was $277,371.40, payable in full or in 10 annual installments with interest.
City Council -
City Council unanimously awarded MCC Inc. of Appleton a paving contract of up to $304,540.14 for the Emmet, 18th and 19th streets project.
City Council -
The Public Works Committee received an update that MCC was expected to finish the 4-2026 Asphalt Resurfacing Project that week, including patches on Harbor and Lake streets, final-surface work on parts of 18th and 19th streets, and completion work on Emmet Street.
Public Works Committee -
Engineering expected to mail final assessment bills about a week after the October 7 resurfacing update.
Public Works Committee -
Public Works reported ongoing street, sidewalk, water-main and lead-service-line work, while storm damage and disposal costs were putting pressure on city budgets.
City Council -
The Public Works Committee agenda lists traffic-speed study information for the 4200 block of Tannery Road.
Public Works Committee -
The Public Works Committee agenda lists traffic-speed study information for Riverview Drive.
Public Works Committee