Two Rivers’ Public Works Committee advanced a new sidewalk-clearance rule and backed state agreements needed to keep four Memorial Drive crosswalks in place during the 2025 resurfacing project.
Key Decisions
The committee recommended a rule requiring sidewalks to remain at least 90% clear of vegetation and other obstructions. The proposal now goes to City Council, where the actual ordinance decision will be made.
The committee recommended that City Council authorize crosswalk agreements with the state at four Memorial Drive intersections. The agreements are needed as part of the planned 2025 state highway resurfacing and would be followed by separate agreements for flashing pedestrian beacons.
Roosevelt Avenue reconstruction was substantially complete, with cleanup work remaining; assessment letters had been sent and private-service invoices were expected shortly. That means affected property owners were moving from construction disruption to the cost-assessment stage.
Public Input
No public comments or communications recorded for this meeting.
Agenda Items
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Sandy Bay Highlands Phase 3 update
Staff reported that the final plat had been submitted for city engineering and Plan Commission review before returning to City Council for formal approval and recording. Construction was underway, with initial sanitary sewer work completed and watermain work expected to finish that week. Crews planned to continue storm sewer, property-service, grading and gravel work before Thanksgiving.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Roosevelt Avenue Reconstruction update
Staff said Roosevelt Avenue construction was complete except for cleanup and other punch-list work. Assessment letters had been sent to affected owners, and invoices for private services were expected near the end of the week. The update did not record a committee action.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Fall Leaf Collection update
Public Works crews were in their fourth week of leaf collection and had completed at least one citywide pass each week. Wet weather forced crews to use plows and loaders rather than the usual collection method, creating more cleanup work. Staff said collection plans would be adjusted day by day and posted on the city website.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Sidewalk Maintenance Clearance Requirements
Passed
The committee recommended sending a proposed change to the sidewalk-maintenance ordinance to City Council. Staff said the current code did not clearly address plants, trees and shrubs growing over or onto sidewalks; the proposed language would require the concrete walking surface to be at least 90% clear of obstructions. The committee’s action was a recommendation, not final adoption of the rule.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Dumpster Permit Requirements
Staff recommended keeping the city’s existing dumpster-safety approach: barricades with flashers rather than reflective tape alone. The public works director said the ordinance allows director-approved reflective tape in place of barricades, but he had not approved any such tape. He also cited the city manager’s report of nearly hitting a dumpster before the barricade-and-flasher requirement was adopted.
COMMITTEE AND COUNCIL MEMBER ITEMS FOR DISCUSSION, INCLUSION IN FUTURE AGENDA AND ACTION, IF NEEDED
The committee identified two follow-up questions from the November 4 City Council meeting: whether a sidewalk is required around East River Street and 23rd Street, and whether sidewalks could be widened into shared pedestrian-and-bicycle trails similar to Mariners Trail. No decision was recorded, but both questions were flagged for future review.
DISCUSS STAFF RECOMMENDATIONS (TRAFFIC AND PARKING CONTROL) - ACTION, ENDORSEMENT OR MODIFICATIONS, AS NEEDED — WDOT Pedestrian Crosswalk Agreements
Passed
The committee recommended that City Council authorize the city manager to sign four state pedestrian-crosswalk agreements for Memorial Drive at Taylor, Columbus, Madison and 12th streets. Staff said the agreements were needed because the state plans to resurface Memorial Drive in 2025 and formally include the crosswalks. Separate agreements would still be needed after resurfacing before the city could install and maintain rectangular rapid flashing beacons.
OTHER ITEMS THAT MAY COME BEFORE THE COMMITTEE: CONSIDERATION AND ACTION, IF NEEDED 1
Staff reported that two dump trucks ordered in March 2023 had been built and delivered to a dealer in Appleton. City staff planned to inspect them before they are sent out for installation of dump boxes, plows, lights and salt-spreading equipment.