The Public Works Committee narrowed options for Harbor Street and 16th Street, favoring either a one-way street with a south-side trail or a wider road with bike markings. Several policy questions—including sidewalk rules, dumpster permits and pavement repairs—remain unresolved and are headed for more work.
Key Decisions
For the Harbor Street, 16th Street and Emmet Street reconstruction, the committee preferred either making Harbor Street one-way with a 10-foot trail on the south side or widening it to 28 feet with bike markings. The project was still in survey and design, with plans hoped for in early 2025.
Council had sent the sidewalk-clearance rule back to this committee for more changes. Rather than settle the policy, the committee’s record says the city will post online when sidewalks must be cleared during snow or ice events.
City crews reported that freezing drizzle on Jan. 6 caught many people off guard and required all-day work on primary streets and residential intersections. Staff planned to pre-brine before the next expected snow event and said a citywide plow would likely depend on snowfall totals.
Public Input
No public comments or communications recorded for this meeting.
Agenda Items
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Sandy Bay Highlands Phase 3 update
Sanitary sewer and water mains were installed. The contractor was working on storm sewer while awaiting a safe water sample; once confirmed, work was expected to shift to sanitary laterals and water services.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Harbor Street, 16th Street and Emmet Street Reconstruction
The reconstruction remained in survey and design, with plans hoped for in early 2025. Staff noted that Harbor Street and 16th Street are designated as an on-street bike route in the city’s 2013 Bike and Pedestrian Plan. The committee discussed a 28-foot street with bike markings, a separate 10-foot south-side trail, or converting Harbor Street to one-way; its stated preferences were a one-way street with a south-side trail or a wider street with bike markings. A home builder also provided information about two homes proposed on Emmet Street during the project.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Public Works Shop Repairs
Staff said an open house was needed with the Personnel and Finance Committee and City Council regarding Public Works shop repairs. The minutes do not provide repair scope, cost or a date for that session.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Sidewalk Maintenance Clearance Requirements
Referred
The minutes say City Council had sent proposed changes to the sidewalk-clearance section of city code back to the committee for additional revisions. The committee sought direction on what changes should be made, but the record does not show a final policy choice. Because snow and ice removal is covered elsewhere in city code, staff said there was no immediate deadline and that the city would post online when sidewalks must be cleared during snow or ice.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Dumpster Permit Requirements
Tabled
The committee recommended tabling draft dumpster-permit language while staff researches a local home builder’s proposed cone base as an alternative to barricades and reflective tape. The minutes do not state when the draft will return or whether the alternative would meet the city’s safety expectations.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Pavement Repair Policy
Staff reported gathering information from another municipality that uses pavement ratings to guide replacement decisions. The rating considers pavement age, condition and likely deterioration. Staff planned further review and a draft for the February meeting.
OTHER ITEMS THAT MAY COME BEFORE THE COMMITTEE: CONSIDERATION AND ACTION, IF NEEDED — Snow Season 1
Staff said freezing drizzle on Jan. 6 arrived instead of the forecast flurries and froze on contact, catching many people off guard. Public Works crews spent the day maintaining primary streets and made alternating passes at residential intersections. For expected snow Jan. 12-13, staff planned pre-brining and said crews would likely plow all city streets unless snowfall was only a trace.