Active Updated

ms4 stormwater permit compliance

Keeping storm sewers, construction sites, and outreach within clean-water rules

Whether the committee/council takes any follow-up action tied to the MS4 report or master plan update (work plan, contracts, or funding) beyond acknowledging the report.

Typically discussed at Public Utilities Committee. Check back when the next agenda is published.

Two Rivers has been cycling MS4 stormwater permit compliance through utility meetings, including a review-and-acknowledge step for the city’s 2025 report to the Wisconsin DNR. The public-facing record here reads like ongoing required reporting plus a separate “master plan update” track.

  1. passed Public Utilities Committee · Mar 2, 2026

    Annual MS4 Repot - Overview

    Motion to authorize Director Heckenlaible to sign the 2025 MS4 Annual Stormwater Report and submit it to the WDNR by the end of March 2026

  1. Public Utilities Committee agenda included a broad “Status Update/Reports” list of operational updates and announcements (including a public meeting on “Planning a Resilient Shoreline”).

    Public Utilities Committee
  2. Agenda included an item titled “STORM WATER UTILITY: UPDATES AND ACTION, AS NEEDED.”

    Public Utilities Committee
  3. The topic appeared on the City Council agenda the same date as the Public Utilities Committee appearance.

    City Council
  4. Agenda included an item titled “WASTEWATER UTILITY: UPDATES AND ACTION.”

    Public Utilities Committee
  5. Agenda included an item titled “STORM WATER UTILITY: UPDATES AND ACTION, AS NEEDED.”

    Public Utilities Committee
  6. Agenda included an item titled “26-039 2025 Annual WDNR MS4 Stormwater Report” to review and acknowledge the city’s 2025 MS4 report submitted to the Wisconsin Department of Natural Resources.

    Public Utilities Committee
  7. The agenda description for the 2025 MS4 report said it summarizes compliance work including public education/outreach, illicit discharge detection and elimination, construction site erosion control, post-construction stormwater management, pollution prevention activities, and stormwater system maintenance; and that annual submission is required under the city’s WPDES MS4 permit.

    Public Utilities Committee
  8. Agenda included an item titled “26-039 2025 Annual WDNR MS4 Stormwater Report” (continued presence of the annual report item in the committee’s meeting cycle).

    Public Utilities Committee
  9. Agenda included an item titled “MS4 Stormwater Master Plan Update.”

    Public Utilities Committee
  10. Continuity tracking shows a deferral signal (matched keyword: “continue”) associated with this topic.

    City Council
  11. Continuity tracking shows cross-body progression associated with this topic.

    City Council
  12. Continuity tracking shows cross-body progression associated with this topic.

    Unspecified meeting body