Advisory Recreation Board

Minutes Agenda City Website ↗

The Advisory Recreation Board approved a long-range parks plan and a concept for Riverside Park that adds parking, but neither action recorded a vote tally. The plan sets broad priorities while major project funding and phasing remain unresolved.

The board approved the Parks and Open Space Full Draft, a 2024-34 roadmap that identifies park upgrades, trail connections, accessibility, safety and maintenance priorities. The document is a planning guide, not a funding commitment, and its next steps include public comment and City Council approval.

The board approved a Riverside Park concept with added parking. The proposal includes a riverfront drop-off loop near an accessible kayak launch, new paths and lighting, restroom and shelter work, and relocating the skate park and a proposed pump track to a more visible area; staff said the work may need to be phased as grants and funding allow.

Zander Park's driveway potholes were patched, while staff presented estimates totaling more than $140,000 for roadway, parking-lot, tennis-court and basketball-court repairs. The board did not record a decision on which repairs, if any, will move forward.

No public comments or communications recorded for this meeting.

NEW BUSINESS — Zander Park – Driveway Issue
Public Works patched and filled the existing potholes in Zander Park's driveway. Staff also presented estimates of $31,373 for basketball courts, $15,510 for the tennis court, $67,849 for the roadway and north parking area, and $25,674 for the south parking area. The minutes do not record a board decision on the proposed repairs.
OLD BUSINESS — Riverside Park Planning Process
Passed
The board reviewed a Riverside Park concept developed after a virtual meeting with Parkitecture. The concept includes a riverfront drop-off loop near the accessible kayak launch, wider lighted walking paths, a limestone pond loop, added parking and seating, restroom and possible shelter updates, and a relocated skate park and proposed all-wheels pump track. The board approved the plan with additional parking; the minutes say implementation may need to occur in phases depending on grants and funding.
OLD BUSINESS — Parks and Open Space Planning
Passed
The board reviewed the Parks and Open Space Full Draft page by page and approved it. The 2024-34 draft identifies accessibility, water recreation, trail connections, varied recreation, natural-space preservation, maintenance and safety as guiding priorities. The presentation lists a public-comment window and City Council approval as next steps, so the board's action did not itself complete citywide adoption.
OLD BUSINESS — Summer Hiring – Kids Camp and Aquatics
Staff reported that recreation clerk, program assistant, special-event coordinator, kids-camp coordinator and concession-stand coordinator positions had been filled, along with many seasonal jobs. The aquatic coordinator position remained unfilled, leaving a key summer aquatics staffing gap.
DIRECTOR'S REPORTS — Capital Project Progress
Staff reported eight completed capital projects, including the beach-alert system, Neshotah Park pathways, Washington Park playground improvements and Senior Center HVAC work. Projects still in progress or coming soon included Riverside Park planning, an adaptive kayak launch and a DNR coastal kayak grant project.
DIRECTOR'S REPORTS — Parks and Facilities Updates
Staff reported that the new beach-alert system was installed at Neshotah Beach, with three signs and online access; conditions had mostly been listed as yellow, or medium hazard. A new batting cage was installed at Vietnam Ball Park, and new playground equipment was installed at Washington Park. Staff also reported restroom vandalism at Veterans, Neshotah and Central parks, with cameras capturing incidents at Veterans and Central.