Two Rivers’ Public Works Committee left several safety and infrastructure questions unresolved, including dumpster visibility rules, pavement markings and traffic behavior on 22nd Street. Major road and bridge projects were reported as nearing key construction milestones.
Key Decisions
Staff will keep studying citywide pavement-marking costs and options after residents raised visibility concerns on 22nd Street. The committee also acknowledged that drivers are using parking lanes as travel lanes and asked engineering staff to explore fixes.
The committee did not change the city’s dumpster safety rule after an initial reaction against allowing reflective tape instead of barricades and flashing lights. Staff will seek more information from the contractor who requested the change.
Roosevelt Avenue was expected to reopen in mid-October after concrete, sidewalks and ramps were completed or nearing completion, though weather could limit final pavement markings. Pedestrians and bicyclists had already regained access to the east-side walk on the Washington Street Bridge.
Public Input
No public comments or communications recorded for this meeting.
Agenda Items
PROJECT STATUS AND ACTION IF NEEDED — Sandy Bay Highlands Phase 3 update
The final plat had been sent to state and county reviewers in mid-September, a process staff said usually takes about 30 days. A preconstruction meeting was scheduled for early October, with the contractor expecting initial sewer, water-main, grading and stormwater work to be done by Thanksgiving. Later work was expected to include curb and gutter, asphalt and completion of stormwater features.
PROJECT STATUS AND ACTION IF NEEDED — Roosevelt Avenue Reconstruction update
Staff reported that mainline and intersection concrete was complete on Roosevelt Avenue, while sidewalks, curb ramps, carriage walks and driveway approaches were being installed. The city expected to reopen the road in mid-October after signs and pavement markings were restored, although weather could affect how much marking work was finished.
PROJECT STATUS AND ACTION IF NEEDED — Washington Street Bridge - Pedestrian Accommodation update
Widened sidewalks on the east approaches and some bridge-deck widening were completed in late September. Public Works reopened the east-side walk to pedestrians and bicyclists on September 27, while remaining concrete cured before cleaning and sealing work.
PROJECT STATUS AND ACTION IF NEEDED — FASTER Migration update
The migration to the FASTER system and in-person training were complete. Public Works and FASTER staff were still resolving minor problems that arose during data conversion.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — WDOT Small Bridge/Culvert Inventory Update
The city submitted one potentially eligible culvert to Manitowoc County for the state inventory: an arch pipe about 900 feet south of Highway 310 on Woodland Drive. Staff said other possible pipes were either too small or outside the city’s maintenance responsibility.
COMMITTEE AND COUNCIL MEMBER ITEMS FOR DISCUSSION, INCLUSION IN FUTURE AGENDA AND ACTION, IF NEEDED — Dumpster Permit Requirements
A contractor asked the city to allow reflective tape instead of barricades with flashing lights for dumpsters placed in the street right-of-way. The committee’s initial reaction was to keep the current requirement, which staff said followed a past incident involving a poorly marked dumpster at night. The public works director will ask the contractor for more examples of communities that allow reflective tape and report back.
COMMITTEE AND COUNCIL MEMBER ITEMS FOR DISCUSSION, INCLUSION IN FUTURE AGENDA AND ACTION, IF NEEDED — Driveway/Approach Ordinance Revision - User Guide 1
A public hearing was scheduled for October 9 on interim driveway-rule language. The city manager also requested a broader review of driveway and approach rules, including comparisons with other communities and a possible residential user guide.
DISCUSS STAFF RECOMMENDATIONS (TRAFFIC AND PARKING CONTROL) - ACTION, ENDORSEMENT OR MODIFICATIONS, AS NEEDED — 22nd Street and Monroe Street - Stop Sign Concerns
New 36-inch stop signs were installed around mid-September. Committee discussion concluded that a reported near-crash was tied to drivers not paying attention to right-of-way rules at an all-way stop, rather than to the signs themselves.
DISCUSS STAFF RECOMMENDATIONS (TRAFFIC AND PARKING CONTROL) - ACTION, ENDORSEMENT OR MODIFICATIONS, AS NEEDED — 22nd Street Pavement Marking
Public Works received a complaint that dashed markings on 22nd Street between Washington Street and Lincoln Avenue were hard to see. Staff repainted white dashes and some solid white markings near Lincoln Avenue with lower-cost latex paint, while noting that epoxy paint lasts longer but costs substantially more. Engineering will gather more information on past marking work and costs as it develops a citywide pavement-marking approach for 2025, and will examine ways to stop drivers from using parking lanes as travel lanes between Washington Street and Forest Avenue.
OTHER ITEMS THAT MAY COME BEFORE THE COMMITTEE: CONSIDERATION AND ACTION, IF NEEDED — 2025 Budget Status - Capital
The committee discussed a preliminary list of 2025 public works capital needs, including road projects, industrial-park expansion, wastewater repairs, sidewalks and parking-lot work. Staff said the first operating-budget draft was more than 11% above 2024, but revisions that removed proposed GIS and maintenance-worker positions brought the increase below 6%. The budget remained in progress, with no final action recorded.
RaiseRite completed mudjacking in the 1700 block of Washington Street to reduce uneven sidewalk joints. The committee also discussed how to address other sidewalk problems along the Washington Street corridor, but took no action.