Public Works Committee

Minutes Agenda City Website ↗

Two Rivers’ Public Works Committee kept disputed snow-clearing bills in place but gave property owners 90 days to pay, while sending two proposed property-maintenance rule changes to the City Council.

After residents challenged $71.72 sidewalk snow-clearing bills, the committee declined to cancel unpaid invoices, extended payment terms to 90 days and tabled the broader policy discussion. The city’s own director said the charges had not been reviewed by attorneys.

The committee authorized up to $475,000 in budgeted repairs and upgrades at the Public Works shop and campus, including roofs, structural repairs, ventilation, security and salt-shed work.

The committee recommended City Council adopt revised rules on sidewalk maintenance clearance and dumpster permits after city attorneys made wording changes for clarity.

Adam Coshow

Coshow disputed his sidewalk snow-removal invoice, arguing the snow was minimal and the city had not shown a clear, item-by-item basis for the charge. He asked for a formal appeal process, clearer snow thresholds and minimum charges in the ordinance, and said the invoices should be voided.

Justin & Taylor Molanders

The Molanders also disputed a sidewalk snow-removal invoice, saying the ordinance does not clearly state how much snow is unacceptable or what the minimum charge can be. They raised concern that nonpayment could lead to a charge on their property tax bill.

NEW ITEMS — Snow Sidewalk Clearing
Tabled
Residents and five written complaints challenged the city’s $71.72 sidewalk snow-clearing invoices after the January 12-13 storm. Director Matthew Heckenlaible said the charge was an average based on clearing, travel and paperwork time, replacing an earlier $167.75 calculation that included more police involvement; he said there was no known formal dispute process. The committee left unpaid invoices in place, extended the payment deadline from 30 to 90 days and tabled further discussion until its next meeting. The director answered that attorneys had not reviewed the prepared charges.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Sandy Bay Highlands Phase 3 update
Heavy rain reportedly sent water over the gravel portion of Orchard Lane. Public Works placed barricades to keep vehicles off the roadway and protect the city’s investment in the new subdivision.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Harbor Street, 16th Street and Emmet Street Reconstruction
The reconstruction project was put out for bids to meet a possible Wisconsin Department of Natural Resources funding deadline, though the agency had not confirmed funding. Bids were scheduled to open March 20, with an award not expected until late April so the special-assessment process could occur first.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Pierce Street
Staff presented a plan for added parking, bike and pedestrian improvements, and repaving on Pierce Street. Plans were about 60% complete, with staff hoping to finish the paving portion before Memorial Day.
ONGOING PROJECT STATUS AND ACTION, IF NEEDED — Public Works Shop Repairs
Passed
The committee authorized identified repairs and improvements using the $475,000 budget allocation. The work includes structural-column repairs, service doors, garage-door openers and safety equipment, windows, siding, roofs, heating and ventilation, salt- and sand-shed deficiencies, and site security. Staff said keeping existing insulated overhead doors rather than replacing them could free enough money for the other needed work.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Sidewalk Maintenance Clearance Requirements
Passed
City attorneys made minor wording changes to the proposed sidewalk-maintenance clearance rules. The committee approved the language and sent it to the City Council for formal adoption.
DISCUSSIONS OR ISSUES ON HOLD, PENDING FURTHER INVESTIGATION — Dumpster Permit Requirements
Passed
City attorneys made minor wording changes to proposed dumpster-permit rules. The committee approved the language and sent it to the City Council for formal adoption.
DISCUSS STAFF RECOMMENDATIONS (TRAFFIC AND PARKING CONTROL) - ACTION, ENDORSEMENT OR MODIFICATIONS, AS NEEDED — Memorial Drive - Detour Route (14th Street Concerns) 1
The committee agreed to investigate a possible speed study for Mishicot Road between 41st and 45th streets after a council listening-session concern about lowering the speed limit. Staff also reported that snow removal near corners and businesses has improved but may require a future discussion about service costs and public expectations. For the Memorial Drive detour, staff recommended monitoring 14th Street and using emergency action only if temporary no-parking restrictions become necessary.
OTHER ITEMS THAT MAY COME BEFORE THE COMMITTEE: CONSIDERATION AND ACTION, IF NEEDED — Salt Shed Inspection Results
A Wisconsin Department of Transportation consultant found minor dry rot in one salt shed and required repairs to cracks in the concrete apron leading to the sheds. Public Works planned to seal the cracks with epoxy grout or tar joint sealant when weather warms.