The Recreation Board moved two major Neshotah Beach questions—the concession stand design and possible paid parking—toward votes next month, while staff gathers more data on parking demand and visitors.
The board reviewed renderings for a proposed new Neshotah Beach concession stand. The design includes concession and storage areas, rentable indoor space with bathrooms and a warming kitchen for about 75 people, plus a patio, outdoor bathrooms, changing rooms and showers. Board members suggested replacing white posts with other design elements and adding anchors that could allow outdoor swings to be moved. The board placed the proposal on its next meeting agenda for a vote.
The board reviewed proposed cleanup-rule changes for special events and agreed with them. Outdoor event organizers would remain responsible for cleanup and for arranging dumpsters and portable toilets. Indoor event organizers could request city setup and cleanup for a fee, while indoor events with more than 100 participants would pay a $25 city-dumpster fee unless they arrange their own dumpster.
The board discussed summer membership and the need to fill a vacancy. Dorothy Tinkham Delo said she will not return when her term ends, while Travis Kadow will continue for another term. Staff reported that outreach for high-school student members had not produced responses and said recruitment would continue.
The board discussed three possible Neshotah Beach parking systems: daily fees for everyone; free resident parking with daily visitor fees; or a $10 resident seasonal fee with daily visitor fees. Staff said a resident-free, visitor-paid system could raise legal concerns under state equal-protection rules. The city plans to install parking counters, explore geofencing visitor-data software, collect concession-stand ZIP codes and complete 50 additional Pierce Street parking spaces by Memorial Day before the board takes up the proposal for a vote next month.
Staff reported that Neshotah Park improvements are moving forward and that a Stewardship Grant application is being prepared for Riverside Park. A federal funding freeze has put the Faith in Place grant for Washington Park tree planting and a youth apprentice on hold, while the Lake Michigan shoreline study is moving ahead after federal funding was confirmed. The proposed new-beach picnic shelter was canceled because of high Army Corps of Engineers permitting fees.