Two Rivers utilities staff flagged rising wastewater disposal costs, a temporary electric-system vulnerability and a possible $1.6 million water-meter upgrade. The committee took no substantive votes, leaving several cost and reliability questions for future decisions.

The city expects to spend about $110,000 more to truck and dispose of wastewater biosolids at a landfill while it waits for state approval that could allow another hauler to accept the material. That is a direct utility-cost pressure residents should track.

During work at the Shoto Substation, Two Rivers is being supplied by one transmission line through Oct. 26, creating a possibility of load reduction if system conditions require it. The city did not report that reductions had occurred.

The committee agreed to keep studying advanced water meters, a project estimated at $1.6 million and financed over 20 years. Staff said the system could provide daily customer-use data, but no final decision was made.

No public comments or communications recorded for this meeting.

PROJECT STATUS UPDATE — 2025 LSL Project
The 2025 lead service line replacement project was expected to finish by mid-November, depending on weather and site conditions. The timeline matters for affected properties and streets still awaiting completion.
PROJECT STATUS UPDATE — 2025 LSL Project
City public works crews were making permanent pavement repairs on 23rd Street where the 2026 lead service line project disturbed the roadway. The agenda labels this as a 2025 project, but the minutes identify the work as tied to the 2026 replacement project.
PROJECT STATUS UPDATE — 2026 Water System Improvement
A contractor was scheduled to begin the water-system improvement project during the week of Oct. 12. Work was to proceed as weather and site conditions allowed.
WASTEWATER UTILITY: UPDATES AND ACTION — Biosolids Disposal
Waste Management agreed to accept a biosolids mix made up of 10% street sweepings and 90% wastewater-treatment sludge. The city estimated landfill trucking and disposal would add $110,000 in costs. United Liquid Waste Hauling remained interested but could not accept the material until the Wisconsin Department of Natural Resources approves it.
WASTEWATER UTILITY: UPDATES AND ACTION — Columbus Lift Station
New covers were installed at the Columbus Lift Station. Planned work includes a new plug and valve and an emergency bypass system intended to improve maintenance access and emergency flexibility; the adjacent sidewalk can now be completed.
WASTEWATER UTILITY: UPDATES AND ACTION — Facilities Plan-Proposal
The city said it must update its wastewater facilities plan to remain eligible for Wisconsin Department of Natural Resources Clean Water Funds. The plan will rank needed improvements and evaluate pump stations and force mains, including the condition of the Parkway lift-station force main installed in the 1960s. The city plans to contract with Town & Country to help assess future wastewater-plant and collection-system needs.
ELECTRIC AND TELECOMMUNICATIONS UTILITIES: DIRECTOR UPDATES AND ACTION IF APPLICABLE — Shoto Substation Construction Project
ATC began replacing a main transformer and related equipment at the Shoto Substation on Sept. 28, with completion anticipated around Dec. 24. Overlapping maintenance work left the city supplied by one transmission line, increasing vulnerability to supply constraints. The city said load reduction could be necessary under certain conditions through Oct. 26.
ELECTRIC AND TELECOMMUNICATIONS UTILITIES: DIRECTOR UPDATES AND ACTION IF APPLICABLE — WPPI Support Services
The committee received an update on WPPI support services, including billing, customer-information systems, advanced metering support and IT support. The proposed 2027 cost was $60,369.
ELECTRIC AND TELECOMMUNICATIONS UTILITIES: DIRECTOR UPDATES AND ACTION IF APPLICABLE — Southside Feeder Maintenance
Crews continued work on the southside electric feeder between Columbus Street and Woodland Drive. The utility obtained contractor quotes for tree trimming and brush removal after WPS declined to share the cost. Staff said the work is intended to improve reliability, maintenance access and removal of hazardous trees near electric infrastructure.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — Water Tower Paint Project
Painting of the eastside water tower was complete. The paint was curing, and staff said the tower could return to service as early as the following week if the curing process and readiness checks were completed.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — Lab Recertification
The water utility completed its required biennial laboratory recertification. Staff reported positive reviews of the laboratory reconstruction.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — Focus on Energy Project
Staff said the city is reviewing energy use, potential savings and its electric distribution model to identify lower-cost efficiency improvements. The committee also discussed a possible advanced water-meter system estimated at $1.6 million, financed over 20 years. Staff estimated annual system-upgrade costs of $30,000 to $40,000, compared with current annual water-meter spending of about $120,000 to $140,000; the committee agreed to continue evaluating costs and benefits before a final decision.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — Upcoming Sanitary Survey
Staff noted that the water utility’s sanitary survey is required every three years under its Wisconsin Department of Natural Resources permit.
STORM WATER UTILITY: UPDATES AND ACTION, AS NEEDED
The committee was told an ordinance update would be presented at the next City Council meeting to close out a grant. The minutes do not describe the proposed ordinance changes.
SOLID WASTE UTILITY: UPDATES AND ACTION, AS NEEDED — PFAS Pilot Project
The city expects to hire a consultant for a PFAS pilot study and feasibility assessment. The study will examine treatment options, land needs, energy use and the physical footprint of a treatment system before the city makes future investment decisions.
SOLID WASTE UTILITY: UPDATES AND ACTION, AS NEEDED — Leaf Collection
Leaf collection was delayed after the May brush storm strained department budgets and used available excess funds. The city planned to collect leaves throughout November, weather permitting.