Two Rivers utilities staff reported a broad new round of water-service checks affecting about 1,000 properties, while the city also moved ahead with lead-service replacement planning and addressed a landfill runoff problem flagged by the state.
No public comments or communications recorded for this meeting.
Staff said the Wisconsin Department of Natural Resources believed funding may be available but had not confirmed it. The city put the project out for bids, to be opened March 20, because any funded contract would need to be awarded, signed and returned to the state by the end of May. Staff said it did not intend to award the work until late April so the special-assessment process could occur.
Staff planned to advertise the east-side lead service lateral project in late March, with bids expected around mid-April. About 150 private-side water services were identified for required replacement, while nearly 200 public-side services in the same area may also need work. Staff said public-side replacements beyond the available contract funds would have to wait for a future contract.
Staff reported that a week of late-February sampling from Riverside Foods showed biochemical oxygen demand and suspended-solids levels well above both the company’s 2023 results and city ordinance limits. Riverside Foods asked for preliminary sewer-billing estimates under two customer categories, and staff provided them. A follow-up meeting was scheduled for March 20.
One of the wastewater plant’s 70-year-old pumps failed and could not be repaired because replacement parts are unavailable. Staff decided to replace both aging pumps at once and retain the still-working old pump as a spare. The plant was operating its final treatment process with one pump and expected normal operations to resume within a few weeks.
The water utility sent letters mainly to address service-inventory classifications that reviewers considered deficient. Staff said many responses came from owners who had not previously received a letter because their service was compliant and did not contain lead. Staff said those owners were satisfied after the explanation.
With help from a Wisconsin Department of Natural Resources consultant, staff completed inventory clarifications and expected to resubmit them to the state that week. The utility expected to notify about 1,000 additional property owners whose private-side service material was listed as unknown. It planned to send one-quarter of the letters each week for four weeks and investigate whether each service is compliant or noncompliant.
The water utility reported that an operator candidate accepted a job offer and was expected to start the week of March 10.
Staff explained that state rules require the utility to thaw a frozen water service once before issuing a Run Water Notice. If the line freezes again after that notice, the utility may charge the property owner for thawing costs. Once a notice is issued, billing is based on past average use rather than actual use during the run-water period, and the utility absorbs the resulting water-loss cost.
Staff said the annual stormwater report needed final review before going to the City Council on March 17 for authorization to sign and submit it to the Wisconsin Department of Natural Resources. The report covers public education and permit-related work such as street sweeping, leaf collection, salt reduction and construction erosion control. Staff said future work will focus on reducing sediment and phosphorus in runoff, with drainage-basin modeling results expected within weeks.
Public works staff addressed ice and overland water flow at the landfill by hauling ice to the wastewater plant and routing collected liquid into the sanitary sewer system for treatment. The Wisconsin Department of Natural Resources sent the city a January letter about the overland-flow situation, and the city needed to provide a response and update by March 17. Staff said a contract had been awarded and signed for corrective work expected to begin the following week, weather permitting.