Dormant New

wastewater pretreatment and industrial discharge

Managing factory wastewater, testing, treatment costs, and discharge limits

Watch for results of the planned April 17 meeting, including whether testing during normal production confirms elevated discharge levels and whether the city sets billing, monitoring or corrective requirements.

Typically discussed at Public Utilities Committee. Check back when the next agenda is published.

Riverside Foods' April test results were lower while a production line was idle, but the city still recorded elevated solids and oxygen-demand readings in its wastewater. The issue had grown from grease buildup and plant-flow problems in 2024 into repeated sampling, discussions of sewer billing and reports that February results exceeded city limits; no final billing, enforcement action or compliance outcome was recorded.

  1. During the June 19-21 storms, staff reported apparent incoming wastewater flows substantially exceeded outgoing flows. Staff said no untreated wastewater was released and the wastewater plant retained capacity.

    Public Utilities Committee
  2. Staff reported finding a partially blocked pipe containing solidified fat, oil and grease. The blockage created a backwater condition and misleading flow readings; it was cleared, and staff continued pH monitoring after grease reached a primary clarifier.

    Public Utilities Committee
  3. Riverside Foods told city staff its construction was not expected to begin until fall because its contractor was booked, though the company was checking whether work could start in mid-August.

    Public Utilities Committee
  4. Staff linked recent wastewater-plant problems to significant fat, oil and grease buildup and reported that the state environmental agency was seeking an on-site meeting and inspection of Riverside Foods' processes.

    Public Utilities Committee
  5. Staff said Riverside Foods contractor work was scheduled to begin Sept. 4, including pavement removal, excavation, tank and piping installation, concrete work, asphalt patching and final striping, with completion expected by Sept. 20.

    Public Utilities Committee
  6. Construction at Riverside Foods began Sept. 3 and was expected to last a few weeks.

    Public Utilities Committee
  7. Wastewater and engineering staff reported observing Riverside Foods' grease-trap cleaning in mid-November and finding floatable material, surface grease and substantial sludge.

    Public Utilities Committee
  8. Staff reported that solids reaching the wastewater plant fell after the grease-trap cleaning but later increased. Suspended solids exceeded 1,000 on Nov. 25 and 26, compared with a typical level of about 200.

    Public Utilities Committee
  9. Staff said Riverside Foods might need weekly grease-trap cleaning and had not arranged monitoring through a private testing laboratory.

    Public Utilities Committee
  10. Staff reported that wastewater loadings associated with Riverside Foods had been high before a Dec. 19 meeting, then settled but were fluctuating again.

    Public Utilities Committee
  11. Staff said the loading changes might depend on grease-tank cleaning or cleaning at the Riverside production plant.

    Public Utilities Committee
  12. Staff reported that the wastewater treatment plant was still experiencing increased loadings despite some relief from equipment installed by Riverside Foods. Another meeting with the company was planned for the following month to review sampling data.

    Public Utilities Committee
  13. Staff reported that a week of late-February sampling from Riverside Foods showed biochemical oxygen demand and suspended-solids levels above both the company's 2023 results and city ordinance limits.

    Public Utilities Committee
  14. Riverside Foods requested preliminary sewer-billing estimates under two customer categories, and staff provided them. A follow-up meeting was scheduled for March 20.

    Public Utilities Committee
  15. Staff said Riverside Foods' latest test results were much lower than the prior month's results because the company was not producing on the relevant line. Elevated suspended solids and biochemical oxygen demand remained, and another meeting was scheduled for April 17.

    Public Utilities Committee