Two Rivers utilities staff flagged a choice that could reshape Harbor Street for drivers, cyclists and nearby residents, while continuing lead-service replacements and preparing for new water-testing requirements.

For the 2025 Harbor Street, 16th Street and Emmet Street project, the committee discussed two possible bike-route designs: making Harbor Street one-way with a south-side trail, or widening it to 28 feet with on-street bike markings. The minutes record those as the committee’s preferred options, but no final design decision was recorded.

The city reported 74 public water-service replacements and 13 private water-service replacements through Dec. 31, with about 150 more services planned in the 2025 east-side lead-service project.

Staff said federal lead-and-copper rule changes require twice-yearly fifth-liter water sampling at 60 locations until the state reviews the city’s corrosion-control study. Staff also warned that the national water-utility association says the timeline and funding limits could affect rates.

No public comments or communications recorded for this meeting.

CONSTRUCTION PROJECTS — 2024-2025 Lead Service Lateral Project update
Staff reported that, through Dec. 31, 74 public water services, 51 public sewer laterals, 13 private water services and nine private sewer laterals had been replaced. The update was informational; no action was recorded.
CONSTRUCTION PROJECTS — Sandy Bay Highlands Phase 3 update
All sanitary sewer and water mains had been installed. The contractor was working on storm sewer work while awaiting a safe water sample, then planned to switch to sanitary laterals and water services.
CONSTRUCTION PROJECTS — Harbor Street, 16th Street and Emmet Street (2025)
The project remained in survey and design, with plans hoped for in early 2025. Staff noted Harbor Street and 16th Street are designated on-street bike routes in the city’s 2013 Bike and Pedestrian Plan. The committee discussed either converting Harbor Street to one-way traffic with a 10-foot south-side trail or widening the street to 28 feet with bike markings; the minutes list those as committee preferences but record no final selection. A home builder also provided information about two homes proposed on Emmet Street during the project.
CONSTRUCTION PROJECTS — 2025 East Side Scattered Lead Service Lateral Project E.
Staff said approximately 150 services were expected to be completed in 2025. No contract award or other formal action was recorded.
Wastewater Plant Roofing Projects WASTEWATER UTILITY: UPDATES AND ACTION — Riverside Foods update
Staff said the city planned to bid public works and wastewater-plant roof work together in one contract to seek better pricing. Separately, staff reported that wastewater loadings associated with Riverside Foods had been high before a Dec. 19 meeting, then settled, but were fluctuating again. Staff said the changes may depend on grease-tank cleaning or cleaning at the Riverside production plant.
Wastewater Plant Roofing Projects WASTEWATER UTILITY: UPDATES AND ACTION — CMOM update
Staff said the state Department of Natural Resources required an update to the city’s wastewater operations and maintenance manual. Engineering was consolidating system-operation and maintenance information into one document, with submission to the DNR planned by the end of January. Staff also reported that the sludge-management plan had been submitted and approved.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED
Staff said its corrosion-control study had been submitted to the DNR and identified excessive debris in water mains, which can create biofilm and increase corrosivity. Revised federal lead-and-copper rules require fifth-liter sampling twice a year at 60 locations until the DNR reviews the study. The American Water Works Association is challenging parts of the rule in court, saying the requirements are not feasible under the timeline and available funding and could affect rates.
ANY OTHER ITEMS OR ISSUES TO COME BEFORE THE COMMITTEE, WITH DISCUSSION AND ACTION
The minutes say Brian Dellemann was looking at clearer terminology for the monthly minimum charge on utility bills, including whether to call it a line fee or meter fee. No change to bills was approved at this meeting.