Two Rivers’ utilities committee backed a county compost-site agreement starting in 2025 while staff reported new wastewater monitoring requirements, a delayed water-tower renovation and pending insurance claims.

The committee supported an agreement that would give Two Rivers access to Manitowoc County’s Woodland Drive composting site after the county closes its current facility. The proposed annual cost is $9,000; staff said operating a local yard-waste and compost site would cost more.

The new wastewater permit adds year-round E. coli testing, PFAS monitoring and several planning deadlines. The added testing will help determine future discharge limits, making this more than a routine permit renewal.

Water-utility staff said the south water tower will not be repainted this year, despite an earlier inspection, because its paint remains acceptable. A failed switchgear unit also could add $80,000 to $100,000 in repair costs to the 2025 budget if insurance does not cover it.

No public comments or communications recorded for this meeting.

CONSTRUCTION PROJECTS — Roosevelt Avenue reconstruction update
Sanitary sewer and water-main work, private sewer laterals and water services were completed within the project area. The contractor was working on storm sewers and expected to move to road grading, gravel and paving after that work. The city said voters would have access across Roosevelt Avenue at Hawthorne Street on Aug. 13 for the Abundant Life Church polling place, with signs directing them there.
WASTEWATER UTILITY: UPDATES AND ACTION — WPDES Permit
A new wastewater discharge permit took effect Aug. 1, 2024, and runs through July 31, 2029; the previous discharge limits stayed in place. The permit replaces summer fecal-coliform testing with twice-weekly, year-round E. coli monitoring and adds PFAS, nitrogen, nitrite, nitrate, chloride and arsenic monitoring. Staff must also submit a revised sewer-maintenance program by Oct. 31, 2024, a sludge-management plan by year-end, and reports on PFAS results in 2025 and 2026.
WASTEWATER UTILITY: UPDATES AND ACTION — Riverside Foods update
Staff shared a contractor schedule for Riverside Foods work beginning Sept. 4. The work was expected to include cutting and removing pavement, excavation, tank and piping installation, concrete work, asphalt patching and final striping by Sept. 20.
ELECTRIC AND TELECOMMUNICATIONS UTILITIES: DIRECTOR UPDATES AND ACTION, IF APPLICABLE — Columbus Street insurance claim update
Repairs to substation unit No. 2 were completed. The utility reported an $80,400 insurance payout after the $5,000 deductible was subtracted from an $85,400 proof of loss.
ELECTRIC AND TELECOMMUNICATIONS UTILITIES: DIRECTOR UPDATES AND ACTION, IF APPLICABLE — Frontier Communications pole attachment agreement status
The utility is renegotiating a Frontier Communications pole-attachment agreement that dates to 1967 and covers the Columbus Street-to-State Highway 310 area. After reviewing Frontier’s proposed revisions with Boardman & Clark, staff sent a revised proposal back to Frontier.
ELECTRIC AND TELECOMMUNICATIONS UTILITIES: DIRECTOR UPDATES AND ACTION, IF APPLICABLE — Utility construction project updates
The utility completed electric service to Braun Truss and installed new or relocated transformers at L.B. Clarke. Paragon received new service, but the utility was running both services while the customer sorted out an electrician’s error involving which panels each service supplied.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — LCRR compliance (due October 16, 2024) update
MSA was mapping water-service materials in a geographic information system for the utility’s lead-service compliance work. Staff said the results would not be published online but could be accessed at the utility office. The utility will need to notify properties with lead, galvanized-replacement-required or unknown service lines.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — Second round of lead and copper testing
The utility began its second round of lead-and-copper testing using the same list of properties as the prior round. Staff reported that 20 of 60 samples had been completed.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — New rack 5 membranes
The new rack 5 membranes had been operating for two to three weeks. One membrane failed but was replaced under warranty.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — South tower mixing pump installation
The south water tower’s mixing pump will be replaced by another vendor. Staff said the utility uses mixing pumps to keep water fresh in its tanks; the east tower pump was replaced in 2023 after both tower pumps failed in 2022.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — South tower drained inspection results and extended timeline on interior renovation to the south tower
A consultant reviewed the south tower, and staff said its paint remained in acceptable condition. The tower will not be painted in 2024; staff said painting may be needed in roughly two to three years.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION, AS NEEDED — Possible generator insurance claim
A switchgear failure is expected to cost between $80,000 and $100,000 to replace. Staff planned repairs for February or March, intended to seek insurance coverage and expected to include repair costs in the 2025 budget. A temporary process using electric-utility personnel was in place.
STORM WATER UTILITY: UPDATES AND ACTION, AS NEEDED — Urban stormwater grant update
Engineering staff reviewed and commented on existing-condition maps needed to establish a baseline for future stormwater modeling. The maps were returned to the consultant in late July.
STORM WATER UTILITY: UPDATES AND ACTION, AS NEEDED — Manitowoc County compost agreement discussion
Passed
The committee supported a proposed agreement beginning Jan. 1, 2025, for Two Rivers to use Manitowoc County’s Woodland Drive composting facility after the county closes that site in the fall. The draft proposed a 12½-year term and a $9,000 annual payment; staff planned to request billing after Jan. 1 so the cost could be budgeted. Staff said the city could not operate a local yard-waste and compost facility for that annual amount.
ANY OTHER ITEMS OR ISSUES TO COME BEFORE THE COMMITTEE, WITH DISCUSSION AND ACTION 1
The committee received a property owner’s request to compost human waste. Staff said the city had no specific ordinance or regulation on the issue and that state law allows it subject to federal disposal requirements.