Two Rivers’ utilities committee voted to end its water-tower maintenance agreement with USG Water Solutions, saying the utility had lost confidence in the contractor and lacked control over needed work.
Key Decisions
The committee authorized a termination letter for the 30-year water-tower agreement with USG Water Solutions. Staff said needed south-tower painting and pump repairs had been pushed back, while a permanent fix for an east-tower roof attachment had not yet been made.
The water utility reported three failed lead-and-copper samples out of 57 results received, but said it would still pass this testing round even if the final three samples failed. Staff said the utility still needs to optimize a state-required treatment chemical.
The committee agreed to order parts for a damaged generator and put an estimated $130,000 repair in the 2025 water-utility budget. Repairs were expected to take eight to nine months, leaving a long timeline for restoring the backup equipment.
Public Input
No public comments or communications recorded for this meeting.
Agenda Items
CONSTRUCTION PROJECTS — Roosevelt Avenue Reconstruction Update
Underground utility work was finished in early August, followed by grading, graveling and mainline concrete placement. Staff expected curb and parking lanes to be placed the week of September 9. Residents were told to bring garbage and recycling to the nearest intersection for collection for the next few weeks.
The utility was waiting to schedule a preconstruction meeting to begin the lead service line contract work. The minutes did not provide a construction date or further project details.
Staff reported a recent PFOA result of 130 and said a future numeric limit could be as low as 20, though no limit had been set. The utility was meeting its mercury limit but reported unusually high sludge production and attributed the significant high-strength wastewater load to Riverside Foods. An updated sewer-management plan is due by the end of October 2024.
ELECTRIC AND TELECOMMUNICATIONS UTILITIES: DIRECTOR UPDATES AND ACTION IF APPLICABLE — Public Power Week - October 6th-12th, 2024
The electric utility planned Public Power Week activities with elementary school students rather than direct customer outreach. Plans included a large coloring poster, additional coloring pages and a food drive with gift cards for winners.
Activities are being planned to work with the elementary schoo — B. Columbus substation unit #1 yearly maintenance
Columbus substation Unit No. 1 was scheduled to be taken offline September 5 for annual inspection and testing. The minutes did not report an expected service impact.
Activities are being planned to work with the elementary schoo — Annual Electric Department equipment inspection
Utility Sales & Service completed its inspection of electric department equipment and boom trucks. Staff reported only a few minor items to address and no major problems.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION AS NEEDED — Tower renovation update
Passed
The committee voted to authorize a letter ending the water utility’s agreement with USG Water Solutions. Staff said the utility had little control over tower maintenance, that the east tower’s roof attachment issue had only a temporary fix, and that USG had deferred south-tower painting and pump repairs that staff believed should be done sooner. The agreement allowed termination with 90 days’ notice before December 14; staff said ending it would let the utility directly coordinate inspections, maintenance and repairs.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION AS NEEDED — Lead and copper sampling/results update 1
The utility had received 57 of 60 lead-and-copper test results, with three failures. Staff said the city would still pass this testing round even if the remaining three samples failed. Staff raised concerns that warmer-than-normal water and low chlorine residual in water mains may have contributed, and said the utility still needs to optimize the state-required treatment chemical.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION AS NEEDED — LCRR compliance update
The utility had to complete its inventory of lead, galvanized and unknown service-line materials by mid-October. Properties with any of those materials were to receive a brochure explaining the result.
WATER UTILITY: DIRECTOR UPDATE, DISCUSSION AND ACTION AS NEEDED — DNR staffing changes E.
Wendy Anderson, the water utility’s longtime state Department of Natural Resources representative, had retired. Staff said it was not yet clear who would take over that role.
The committee agreed to order parts for a damaged generator and budget repair costs in the 2025 water utility budget. Staff estimated repairs at about $130,000 and said they would take eight to nine months. A consultant did not expect an insurance claim to qualify because of the generator’s age and because many repairs involved normal part failures.
Generator quote STORM WATER UTILITY: UPDATES AND ACTION, AS NEEDED — Urban Storm Water Grant Update
The stormwater consultant said work on the city’s updates would resume in early September after a month focused on construction projects. The new street sweeper was due to arrive September 4, followed by staff training.
SOLID WASTE UTILITY: UPDATES AND ACTION, AS NEEDED
Staff said the city needed to hire a contractor to install a proposed landfill effluent underdrain system. The work is intended to address an ongoing seep.