Mark Bittner

City Council Member

Council term ends in spring 2027. Election dates · Contact Mark Bittner

Back to the Council record

Issue history

Developments on issues from this member’s record. Other officials and committees also took part.

city budget

General government budgets were not reviewed at this meeting; staff said they will come back at a future meeting. The committee did note expectations that shared revenue and highway aid will rise in 2026 and that property/liability insurance costs may drop—good news if it holds, but it’s still a projection until the full budget is shown.

Reported Oct 2, 2025 · Source

Personnel and Finance Committee Meeting

City Budget
city budget

The finance director reported the General Fund was running close to plan through August 2025, with spending slightly ahead of the straight-line pace but described as “very close to budget overall.” This is the kind of checkpoint residents should expect to see regularly—especially before big 2026 budget choices lock in.

Reported Oct 2, 2025 · Source

Personnel and Finance Committee Meeting

City Budget
snow removal

The committee reviewed how Public Works prioritizes plowing by storm size, including brining routes pre-storm and focusing on primary roads first in smaller events. Staff also said they are trying to round corners more to reduce snow buildup at intersections. This is mostly operational, but it’s useful context for residents who wonder why their street is (or isn’t) first in line during a storm.

Reported Oct 1, 2025 · Source

Public Works Committee

Snow Removal
snow removal

Staff said the topic was reintroduced with the city attorneys, but the committee is still waiting for clarification and direction. The attorneys advised that changing all ordinance language would run contrary to state statute and recommended against that approach; a possible alternative mentioned was charging a fee per foot of sidewalk cleared (around $1.00). This is a policy choice with real neighborhood impact—especially for seniors, landlords, and corner lots—and it’s still drifting without a clear next step.

Reported Oct 1, 2025 · Source

Public Works Committee

Snow Removal
city budget

Staff emphasized the 2026 Public Works budget is still preliminary and complicated by pending staffing changes, including retirements, a WDNR requirement to include a Certified Collection System Operator, and a request for engineering support. Benefits are up, overtime was reduced, and staff proposed increasing standby and snow watch pay to better match other departments. This is the kind of early budget framing that can quietly lock in priorities before the public sees a final version, so residents should track what changes between “preliminary” and adoption.

Reported Oct 1, 2025 · Source

Public Works Committee

City Budget
utility infrastructure financing

The committee did not advance the discussion on alternatives to the current approach, noting staff had not had time to look into options like a wheel tax or a transportation utility. That’s a red flag for process: street funding debates don’t get easier with delay, and “no time” effectively becomes a decision to keep the status quo by default.

Reported Oct 1, 2025 · Source

Public Works Committee

Utility Infrastructure Financing
lincoln ave

Staff reported WDOT will remove and replace incorrect pavement markings by grinding them off and re-marking the correct area, though discoloration may remain visible. They also noted shrinkage cracking in the concrete bridge overlay; WDOT said the deck will likely need epoxy sealing in the next several years. Residents should watch whether the state treats this as routine maintenance or another slow-moving fix that lingers after the project is “done.”

Reported Oct 1, 2025 · Source

Public Works Committee

Lincoln Ave
sandy bay highlands

Staff laid out the expected construction timeline: curb/gutter and paving targeted by the end of October, with final restoration by mid-November. Drainage swale work is still in the quoting stage, and planting is expected in spring 2026. This is a straightforward schedule update, but residents near the project should expect work to stretch into late fall and then pick back up next spring.

Reported Oct 1, 2025 · Source

Public Works Committee

Sandy Bay Highlands
neshotah beach / beach parking / capital improvements

Staff laid out three paths for the Neshotah Beach concession stand: a basic code-focused fix (~$43,000), a major interior rework (~$360,636), or a brand-new building with expanded restrooms and year-round indoor rental space. Councilmembers’ “general consensus” favored the major remodel, with interest in fully enclosing/opening the covered patio area — a sign the city may be heading toward a sizable investment at the beach. Staff also floated a fee-based parking plan for Lots 2 and 3 on 10 peak beach days in 2026 ($10/day), potentially staffed by seasonal workers or community groups that could earn a share as fundraising; the council was described as receptive, but no decision was made.

Reported Sep 29, 2025 · Source

City Council Work Session

Neshotah Beach Beach Parking Capital Improvements
utilities budget

The council approved switching the city into the state’s public employer group health insurance program starting Jan. 1, 2026. The minutes don’t spell out the cost comparison, coverage changes, or why this option was chosen, which are the details residents and city employees typically care about most. The vote was unanimous.

Reported Sep 29, 2025 · Source

City Council Work Session

Utilities Budget
dnr grant

An update from a Friends meeting said raised beds may be changed to depressed in-ground beds. That kind of design change can affect cost, maintenance, and how well the project works—so it’s worth watching for a clearer explanation of why the change is being considered and who signs off on it.

Reported Sep 16, 2025 · Source

Environmental Advisory Board Meeting

DNR Grant
washington park shoreline restoration

The board flagged geese as an issue affecting the trail at Washington Park. The minutes don’t show a plan or timeline, but it’s a quality-of-life problem that can quickly turn into a maintenance and usability issue if it’s not addressed.

Reported Sep 16, 2025 · Source

Environmental Advisory Board Meeting

Washington Park Shoreline Restoration
city budget / police union contract

Council approved a 2-year settlement/collective bargaining agreement with the police union. Labor agreements set pay and working conditions and can shape the city’s budget for years, so this is a major policy-and-cost decision even when it’s presented as a settlement. The vote was unanimous.

Reported Sep 15, 2025 · Source

City Council Meeting

City Budget Police Union Contract
sewer service charges / utility rates

Council adopted an ordinance changing the city’s sewer service charge amounts. This is one of the most direct ways city decisions show up in household bills, and it passed 8-1 with one dissenting vote. The minutes don’t include the new rates or the size of the change, so residents will need the ordinance text to see the real impact.

Reported Sep 15, 2025 · Source

City Council Meeting

Sewer Service Charges Utility Rates
street use

Council replaced a “no parking” restriction with a 15-minute loading zone between two driveways at 1900 School Street. This is a small change, but it affects day-to-day traffic flow and enforcement near a business. The vote was unanimous.

Reported Sep 15, 2025 · Source

City Council Meeting

Street Use
city budget / urban forestry / community development authority / tree removals

Council voted to add more 2025 budget money for tree removals, shifting funds within urban forestry and community development. It passed 6-3, with three councilmembers voting no—worth noting because it suggests real disagreement about either the cost, the approach, or how the city is prioritizing removals. Residents who care about neighborhood tree loss and street impacts should track how removals are being selected and communicated.

Reported Sep 15, 2025 · Source

City Council Meeting

City Budget Urban Forestry Community Development Authority Tree Removals
dnr grant / urban forestry

Council authorized staff to apply for a 2026 DNR urban forestry grant. Grant applications can bring outside money into city projects, but they can also commit the city to match requirements or follow-on costs later—details that aren’t spelled out in these minutes. The resolution passed unanimously.

Reported Sep 15, 2025 · Source

City Council Meeting

DNR Grant Urban Forestry
harbor

Council approved a land lease agreement with Randy Meyer and authorized the City Manager and City Clerk to sign. The minutes do not describe the land, the lease terms, or what the city is getting in return, which makes it hard for residents to judge whether the deal is a good one. The vote was unanimous.

Reported Sep 15, 2025 · Source

City Council Meeting

Harbor
planned unit development pud / st marks square

Council held the required public hearing and then approved changes to the previously approved planned development plan for St. Mark’s Square. No one spoke during any of the three calls for public input, which leaves residents with little on-the-record explanation of what’s changing and why. The vote was unanimous.

Reported Sep 15, 2025 · Source

City Council Meeting

Planned Unit Development PUD St Marks Square
als lift assist billing

The Senior Center plans to do its own goal-setting, and staff will reach out to the Two Rivers Fire Department about non-emergency calls. This is the kind of practical, day-to-day issue that can matter to older residents—especially if it affects response expectations, referrals, or when to call for help.

Reported Sep 8, 2025 · Source

Committee On Aging

ALS Lift Assist Billing
fence height regulation

The commission discussed gaps in the current fence rules after seeing fences built close to sidewalks, which can limit visibility when drivers back out of driveways. They noted the ordinance doesn’t require a front-yard fence setback except in specific vision-clearance areas (like corner lots). Commissioners expressed interest in an ordinance change requiring fences to be at least 3 feet back from sidewalks, which would be a meaningful rule change for future fence projects.

Reported Sep 8, 2025 · Source

Plan Commission Meeting

Fence Height Regulation
ordinance variance appeals

The applicant asked for permission to build a deck that would encroach into the rear-yard setback. Staff presented its findings, and the chair opened the required public hearing and called three times for comments. No one attended or spoke, so the hearing closed with zero public input—important context when a request affects close-quarters spacing near a property line.

Reported Sep 4, 2025 · Source

Zoning Board of Appeals Meeting

Ordinance Variance Appeals
snow removal / sidewalk snow removal rules

Members flagged three future topics residents will care about: bike accommodations on 22nd Street near the bridge (raised by a resident at a City Council meeting), and potential changes to sidewalk snow-shoveling rules and snow-plowing practices. These are the kinds of policies that can quickly turn into neighborhood-level friction, so it’s worth watching whether the committee brings forward clear, enforceable standards—or leaves things vague and complaint-driven.

Reported Sep 3, 2025 · Source

Public Works Committee

Snow Removal Sidewalk Snow Removal Rules
sandy bay highlands

The committee got a round-up of active work: Sandy Bay Highlands Phase 3 contract award was already teed up for City Council, the public works shop roof repair contract was still pending, and WDOT was reviewing lane-width issues on the Washington Street Bridge. Staff is also studying Memorial Drive speeds while deciding between speed reduction options or returning to the original RRFB plan at key crossings. Separately, DPW plans to start preparing the 18th Street outdoor bulk storage site this fall after BIDC/CDA approval, and noted repairs near the Madison Street bridge approaches and parapet wall work with the county.

Reported Sep 3, 2025 · Source

Public Works Committee

Sandy Bay Highlands
stormwater management

Staff warned the 2026 stormwater budget season may be tight and said inlet/catch basin cleaning has fallen behind due to staffing shortages, with the street sweeper used when possible. They also noted the city will need to identify stormwater projects to meet WDNR permit requirements. This is the kind of slow-burn maintenance issue that can turn into flooded streets and bigger repair bills if it keeps slipping.

Reported Sep 2, 2025 · Source

Public Utilities Committee Meeting

Stormwater Management