Mark Bittner
City Council Member
Council term ends in spring 2027. Election dates · Contact Mark Bittner
Issue history
Developments on issues from this member’s record. Other officials and committees also took part.
No update was provided on 2025 lead and copper testing because the staff member who would normally report it was not present. Given how sensitive lead-related compliance is—and how much lead service replacement work is already in motion—this is a gap residents should expect to be filled in a future meeting record.
The electric utility reported routine field work (pole staging, new pole installation with safety coordination near a high-pressure gas main, service disconnection at the former Family Video site, and 100+ meter swaps). Staff also described a tornado-style mock emergency exercise designed to test readiness if top leadership is unavailable, and recommended doing it annually and expanding it citywide. That’s the kind of behind-the-scenes planning residents only notice when it’s missing during a real outage.
The committee was briefed on a sewer rate study that would raise the fixed fee and the volume fee, reduce or eliminate an extra charge that mainly applied to multi-family dwellings, and add an “equivalent meter” style charge aimed at customers with higher system demand. It also proposes moving some higher-strength commercial/industrial dischargers into a different rate category—an important cost-shift question that deserves public attention before it becomes a done deal at Council. Staff said draft ordinance revisions should be ready for the Sept. 15 City Council meeting.
Reported Sep 2, 2025 · Source
Public Utilities Committee Meeting
Utility Rates Lead Service Lines Sanitary Sewer InfrastructureStaff outlined several ongoing efforts: a traffic study on Memorial Drive aimed at lowering speeds so the city can use cheaper solar flashing beacons instead of a HAWK signal; updates on Harbor, 16th, and Emmet Street construction; and lead service lateral replacement planning. They also discussed possible renovation or replacement of the 1950s Neshotah Beach concession stand, with an explicit goal of reducing reliance on property taxes and generating revenue through rentals and improved concessions—ideas were still preliminary. The city is also waiting on a major DNR grant decision for Riverside Park and the skate park, which could shift what gets built and when.
Council awarded the Sandy Bay Highlands Subdivision No. 3 curb, gutter, and paving contract to Vinton Construction Company for $342,593.90 as the lowest qualified bid. This is a straightforward infrastructure award with a clear cost and contractor. The minutes note Councilmember Bonnie Shimulunas arrived during the voting, so the recorded roll call reflects the members present at that moment.
Council approved applying for a DNR grant for shoreline restoration at Washington Park. Applying doesn’t guarantee the money, but it signals the city is pursuing outside funding for erosion/shoreline work that can be expensive if left to local taxpayers alone. The minutes don’t include the grant amount or the city’s required match, which are the key details residents usually want up front.
Reported Sep 2, 2025 · Source
Washington Park Shoreline Restoration DNR Grant Washington Park Shoreline RestorationCouncil approved a second, larger water system borrowing authorization, up to $1,038,658. Again, the minutes record the vote but don’t spell out the project list or the practical impact on future water rates, leaving residents to connect the dots later when costs show up in budgets and bills. Taken together with the Series 2025A vote, this meeting authorized up to about $1.39 million in water revenue bond borrowing.
Council voted to authorize issuing and selling up to $352,978 in water system revenue bonds. The minutes don’t explain in plain terms what specific project(s) this borrowing funds, which makes it harder for residents to judge whether the debt is worth it. What is clear: this is another long-term financing commitment tied to the water utility and, over time, ratepayers.
Police Chief Meinnert told council the city’s livestock ordinance allows chickens in some districts but does not allow slaughtering them, creating enforcement problems. He recommended changing the ordinance to allow slaughtering in specific districts if it’s humane and doesn’t disturb neighbors, framing it as a consistency and practicality fix for residents who already raise chickens. No ordinance change was voted on at this work session, but this discussion signals a likely policy change coming to a future council agenda.
Reported Aug 25, 2025 · Source
Licensing of Dogs and Regulation of AnimalsCouncil reviewed an architectural drawing for a proposed new beach pavilion/concession stand and discussed possible funding sources and what the facility could be used for long-term. The key takeaway is that the city is weighing whether to pursue a bigger re-think rather than a basic fix, even as the current pavilion and concession stand are described as needing replacement or upgrades soon. This is the kind of project where costs and priorities can drift unless council clearly defines what problem it’s solving and what price tag residents are being asked to carry.
The city’s consultant said sewer rates will need to increase starting in 2026 to keep the system running and maintained. Council’s questions focused in part on how the change could affect commercial properties, which matters because those costs often get passed along to customers and renters. No rate numbers or timeline details are included in these minutes, so residents should expect the real decision points to come later when a specific rate proposal is put on the table.
Staff reviewed the 2025 urban forestry and tree planting budget and said a large share has come from WDNR grants — and that those grants are expected to be harder to get going forward. That matters because ash tree removal and ongoing tree work don’t go away just because grant money does; the board discussed the possibility of raising the city’s Environmental Fee to help cover costs, with contracting likely since staff capacity is limited. This is an early warning sign residents should track before it turns into a rushed fee increase later.
Council did not adopt the proposed two-year police union agreement at this meeting; the item was tabled because the union still needed to vote first. Labor contracts are major budget drivers, so residents should expect the full cost details and key terms to be clearly presented when it comes back. For now, the decision is simply delayed, not rejected.
Council approved a variance from the facade program guidelines and authorized a partial payout of $23,556 to The Hook Lanes & Games. The key issue isn’t the business—it’s the process: once exceptions become normal, the program can start to feel discretionary instead of rule-based. Residents should watch whether the city documents consistent standards for when it bends its own guidelines.
Council approved a resolution changing the 2025 General Fund budget tied to inspection services. The minutes don’t spell out the dollar amount or what specifically changed (staffing, contract costs, or workload), which makes it harder for residents to judge the tradeoffs. This is the kind of mid-year fix that deserves clearer public explanation in the record.
The commission reviewed an amended development plan for St. Mark’s Square now owned by Curt Gesell (not including the school lot). The plan is to convert the former convent into a 4-unit apartment building, build a new 4-unit building to the south, and add some parking; the applicant said the exterior of the convent would not change and the site is currently vacant. The commission recommended City Council approval with conditions: no exterior changes to the convent and the project must be completed within 3 years, with additional reviews still required before construction (site/architectural review and building inspection).
City staff gave a summary of activity and finances for each TID and reported that Baird was hired to prepare a valuation estimate for all TIDs, with a report expected the next week. That valuation work is a big deal because it can shape expectations about whether TIDs are generating the tax base growth they were created for—and how much risk or payoff the city is carrying. Staff said the information would be shared once received, so the public still needs to see the actual numbers to judge performance.
Staff said the BIDC/CDA granted exceptions to let DPW move bulk storage piles/materials from the lakefront Public Works site to the 18th Street Cell Tower location. That move matters because it’s a real step toward shifting industrial-looking storage away from the shoreline — but it’s also being staged through exceptions and follow-up meetings, with the industrial park businesses given another chance to weigh in before major material is moved.
Staff ran through a long list of project updates, including Sandy Bay Highlands Phase 3 (contract prep for curb/gutter and first asphalt lift), Pierce Street being finished (including internal trails), and remaining Public Works shop repairs (roof contract still needed). The biggest red flag was Memorial Drive/Washington Street Bridge: staff said lane widths don’t match the plan, cracking looks worse than expected, and curb heights now make sidewalk strikes easier — issues that should be documented and pressed with the state before they become “too late to fix.”
A brief Council update noted members would be meeting the new City Manager after the Committee on Aging meeting and referenced a listening session on Aug. 16. It also mentioned “new lead laterals,” but the minutes don’t provide details—if this is about replacing lead service lines, residents will want clearer information on scope, timeline, and who pays.
Staff said fake garbage stickers are still being found, with Manitowoc Disposal notifying DPW and police. They also noted social media chatter about switching away from the sticker system to an automated option, but said the sticker approach remains the most affordable and the committee didn’t see a reason to revisit it. The unresolved piece for residents is enforcement and deterrence—fake stickers shift costs and headaches onto everyone else if the city can’t curb it.
Reported Aug 4, 2025 · Source
Public Utilities Committee Meeting
Garbage and Recycling Service ChangesCouncil did not adopt the proposed 2025 budget amendment related to inspection services. Instead, it unanimously postponed the item until the Aug. 18 council meeting, leaving the budget change pending.
Public Works Director Matt Heckenlaible discussed a proposed 4% increase in sewer-utility revenue. The discussion covered replacing sanitary laterals beneath streets, possible Clean Water Fund borrowing for sewer-lining projects and the need for more funding. Council took no action, leaving the rate question unresolved.
Reported Aug 4, 2025 · Source
City Council Meeting · Minutes, page 6
Sewer Service Charges Capital ImprovementsCouncil approved an amended permit for Green Acres Landscaping at 2005 Hawthorne Ave. The permit limits retail sales to 7 a.m. to 7 p.m. daily, requires attention to two-way traffic on the east side and prohibits compost on the property. The vote was unanimous.
Council approved an amended permit for Ross Auto & Transmission at 2005 Hawthorne Ave. The final approval added retail-sales hours of 7 a.m. to 7 p.m. daily and required attention to two-way traffic on the east side. The vote was unanimous.
Reported Aug 4, 2025 · Source
City Council Meeting · Minutes, page 1 · Minutes, page 2
Conditional Use Permits