Shannon Derby
City Council Vice President
Council term ends in spring 2027. Election dates · Contact Shannon Derby
Issue history
Developments on issues from this member’s record. Other officials and committees also took part.
Staff emphasized the 2026 Public Works budget is still preliminary and complicated by pending staffing changes, including retirements, a WDNR requirement to include a Certified Collection System Operator, and a request for engineering support. Benefits are up, overtime was reduced, and staff proposed increasing standby and snow watch pay to better match other departments. This is the kind of early budget framing that can quietly lock in priorities before the public sees a final version, so residents should track what changes between “preliminary” and adoption.
The committee did not advance the discussion on alternatives to the current approach, noting staff had not had time to look into options like a wheel tax or a transportation utility. That’s a red flag for process: street funding debates don’t get easier with delay, and “no time” effectively becomes a decision to keep the status quo by default.
Staff reported WDOT will remove and replace incorrect pavement markings by grinding them off and re-marking the correct area, though discoloration may remain visible. They also noted shrinkage cracking in the concrete bridge overlay; WDOT said the deck will likely need epoxy sealing in the next several years. Residents should watch whether the state treats this as routine maintenance or another slow-moving fix that lingers after the project is “done.”
Staff laid out three paths for the Neshotah Beach concession stand: a basic code-focused fix (~$43,000), a major interior rework (~$360,636), or a brand-new building with expanded restrooms and year-round indoor rental space. Councilmembers’ “general consensus” favored the major remodel, with interest in fully enclosing/opening the covered patio area — a sign the city may be heading toward a sizable investment at the beach. Staff also floated a fee-based parking plan for Lots 2 and 3 on 10 peak beach days in 2026 ($10/day), potentially staffed by seasonal workers or community groups that could earn a share as fundraising; the council was described as receptive, but no decision was made.
An update from a Friends meeting said raised beds may be changed to depressed in-ground beds. That kind of design change can affect cost, maintenance, and how well the project works—so it’s worth watching for a clearer explanation of why the change is being considered and who signs off on it.
The board flagged geese as an issue affecting the trail at Washington Park. The minutes don’t show a plan or timeline, but it’s a quality-of-life problem that can quickly turn into a maintenance and usability issue if it’s not addressed.
Reported Sep 16, 2025 · Source
Environmental Advisory Board Meeting
Washington Park Shoreline RestorationCouncil approved a 2-year settlement/collective bargaining agreement with the police union. Labor agreements set pay and working conditions and can shape the city’s budget for years, so this is a major policy-and-cost decision even when it’s presented as a settlement. The vote was unanimous.
Council adopted an ordinance changing the city’s sewer service charge amounts. This is one of the most direct ways city decisions show up in household bills, and it passed 8-1 with one dissenting vote. The minutes don’t include the new rates or the size of the change, so residents will need the ordinance text to see the real impact.
Council replaced a “no parking” restriction with a 15-minute loading zone between two driveways at 1900 School Street. This is a small change, but it affects day-to-day traffic flow and enforcement near a business. The vote was unanimous.
Council voted to add more 2025 budget money for tree removals, shifting funds within urban forestry and community development. It passed 6-3, with three councilmembers voting no—worth noting because it suggests real disagreement about either the cost, the approach, or how the city is prioritizing removals. Residents who care about neighborhood tree loss and street impacts should track how removals are being selected and communicated.
Reported Sep 15, 2025 · Source
City Budget Urban Forestry Community Development Authority Tree RemovalsCouncil authorized staff to apply for a 2026 DNR urban forestry grant. Grant applications can bring outside money into city projects, but they can also commit the city to match requirements or follow-on costs later—details that aren’t spelled out in these minutes. The resolution passed unanimously.
Council approved a land lease agreement with Randy Meyer and authorized the City Manager and City Clerk to sign. The minutes do not describe the land, the lease terms, or what the city is getting in return, which makes it hard for residents to judge whether the deal is a good one. The vote was unanimous.
Council held the required public hearing and then approved changes to the previously approved planned development plan for St. Mark’s Square. No one spoke during any of the three calls for public input, which leaves residents with little on-the-record explanation of what’s changing and why. The vote was unanimous.
The Senior Center plans to do its own goal-setting, and staff will reach out to the Two Rivers Fire Department about non-emergency calls. This is the kind of practical, day-to-day issue that can matter to older residents—especially if it affects response expectations, referrals, or when to call for help.
The commission discussed gaps in the current fence rules after seeing fences built close to sidewalks, which can limit visibility when drivers back out of driveways. They noted the ordinance doesn’t require a front-yard fence setback except in specific vision-clearance areas (like corner lots). Commissioners expressed interest in an ordinance change requiring fences to be at least 3 feet back from sidewalks, which would be a meaningful rule change for future fence projects.
The applicant asked for permission to build a deck that would encroach into the rear-yard setback. Staff presented its findings, and the chair opened the required public hearing and called three times for comments. No one attended or spoke, so the hearing closed with zero public input—important context when a request affects close-quarters spacing near a property line.
The committee reviewed traffic counter data from Memorial Drive showing many drivers over the speed limit, including a high share northbound and very high maximum speeds. They also voted to recommend a 15-minute loading zone on School Street near 1900 School Street after a business requested help with RV/camper drop-offs; the recommendation goes to City Council next. Staff also flagged that replacing traffic-signal control cabinets would run about $30,000 per intersection before installation and wiring—useful context for future budget decisions.
Members flagged three future topics residents will care about: bike accommodations on 22nd Street near the bridge (raised by a resident at a City Council meeting), and potential changes to sidewalk snow-shoveling rules and snow-plowing practices. These are the kinds of policies that can quickly turn into neighborhood-level friction, so it’s worth watching whether the committee brings forward clear, enforceable standards—or leaves things vague and complaint-driven.
Staff warned the 2026 stormwater budget season may be tight and said inlet/catch basin cleaning has fallen behind due to staffing shortages, with the street sweeper used when possible. They also noted the city will need to identify stormwater projects to meet WDNR permit requirements. This is the kind of slow-burn maintenance issue that can turn into flooded streets and bigger repair bills if it keeps slipping.
No update was provided on 2025 lead and copper testing because the staff member who would normally report it was not present. Given how sensitive lead-related compliance is—and how much lead service replacement work is already in motion—this is a gap residents should expect to be filled in a future meeting record.
The electric utility reported routine field work (pole staging, new pole installation with safety coordination near a high-pressure gas main, service disconnection at the former Family Video site, and 100+ meter swaps). Staff also described a tornado-style mock emergency exercise designed to test readiness if top leadership is unavailable, and recommended doing it annually and expanding it citywide. That’s the kind of behind-the-scenes planning residents only notice when it’s missing during a real outage.
The committee was briefed on a sewer rate study that would raise the fixed fee and the volume fee, reduce or eliminate an extra charge that mainly applied to multi-family dwellings, and add an “equivalent meter” style charge aimed at customers with higher system demand. It also proposes moving some higher-strength commercial/industrial dischargers into a different rate category—an important cost-shift question that deserves public attention before it becomes a done deal at Council. Staff said draft ordinance revisions should be ready for the Sept. 15 City Council meeting.
Reported Sep 2, 2025 · Source
Public Utilities Committee Meeting
Utility Rates Lead Service Lines Sanitary Sewer InfrastructureStaff outlined several ongoing efforts: a traffic study on Memorial Drive aimed at lowering speeds so the city can use cheaper solar flashing beacons instead of a HAWK signal; updates on Harbor, 16th, and Emmet Street construction; and lead service lateral replacement planning. They also discussed possible renovation or replacement of the 1950s Neshotah Beach concession stand, with an explicit goal of reducing reliance on property taxes and generating revenue through rentals and improved concessions—ideas were still preliminary. The city is also waiting on a major DNR grant decision for Riverside Park and the skate park, which could shift what gets built and when.
Council awarded the Sandy Bay Highlands Subdivision No. 3 curb, gutter, and paving contract to Vinton Construction Company for $342,593.90 as the lowest qualified bid. This is a straightforward infrastructure award with a clear cost and contractor. The minutes note Councilmember Bonnie Shimulunas arrived during the voting, so the recorded roll call reflects the members present at that moment.
Council approved applying for a DNR grant for shoreline restoration at Washington Park. Applying doesn’t guarantee the money, but it signals the city is pursuing outside funding for erosion/shoreline work that can be expensive if left to local taxpayers alone. The minutes don’t include the grant amount or the city’s required match, which are the key details residents usually want up front.