Bill LeClair
City Council Member
Issue history
Developments on issues from this member’s record. Other officials and committees also took part.
Staff described a recurring redevelopment problem on narrow lots: contractors need space for dumpsters, trailers, materials, and worker parking, which can swallow street parking and squeeze traffic and driveway access. The city has already allowed a sidewalk closure in one case, and the resulting work zone still created a tight corridor for neighbors. A multi-department meeting with Jim Reif Builders was scheduled for Jan. 29 to set clearer expectations that protect pedestrian access and neighborhood function while still allowing projects to get built.
Staff reported the city has enough salt for now and outlined how staffing and back-to-back storms limited the city’s ability to respond quickly to sidewalk-clearing complaints. The bigger unresolved issue is a recurring winter friction point: plowing curb-to-curb can push snow onto terraces and then back onto sidewalks, triggering complaints from residents who already shoveled. The committee also flagged the lack of clear, written expectations for downtown snow handling (including whether businesses can push snow into the street), and staff said guidance will need to be written and sent to the Main Street district.
Staff said plans, specs, and bid documents are being prepared and should be ready soon. This is an early-stage update, but it’s the point where residents should start watching for timing, traffic impacts, and whether the bid package matches what neighborhoods were told to expect. No schedule or cost details were included in these minutes.
Strand Associates’ Water Supply Service Area Plan was presented, and the committee did not raise questions. Staff said the plan will be forwarded to WDNR. Even without a vote here, this is a foundational planning document that can affect future service boundaries and growth assumptions.
Staff introduced Shawn Taddy as the new Lead Operator, with the expectation he will step into the Superintendent role in early May 2026. The committee also heard the citywide sewer pipe lining project is expected to start in late January or early February. Staff said the regional Sewer Service Area Plan update is aiming for completion in early 2026, with the main change being Kossuth Sanitary District (Rockwood) shifting discharge to Manitowoc along County Trunk R.
Staff outlined that the city operates 12 tax increment districts and said a performance review based on 2025 data would drive recommendations, including early termination of underperforming districts and amendments to active districts to reflect state law changes. This is high-stakes because TIDs affect where growth is steered and how long certain project costs stay on the books, but the minutes excerpt does not show what direction council gave staff or what specific districts were targeted.
Council adopted the firefighter union settlement agreement, described in the minutes as including scheduled wage adjustments and targeted updates to benefits, training compensation, and lateral hiring provisions. The city framed it as a recruitment/retention move while keeping costs “predictable,” but residents should still watch how these terms affect future budgets and staffing flexibility. The resolution passed by roll call.
Council adopted a new annual “weights and measures” license requirement for devices used to calculate charges by weight/measure, with operators paying the City’s actual inspection costs. This is a compliance-and-cost pass-through policy: it formalizes inspections and shifts the bill to the businesses using the devices, which can matter for local operators depending on how the City calculates and documents those costs.
Council voted to deny a request to waive the city’s sex-offender residency restrictions. The stated reasons for denial included the nature of the offense, no qualifying exemption or prior residency tie, inaccuracies in the request, and that the applicant bought a home knowing the ordinance existed—so the Council treated this as an enforcement decision, not a hardship exception.
Council approved a deal to transfer the City’s interest connected to the 18th Street cell tower site in exchange for a $305,000 lump-sum payment, authorizing the City Manager to sign closing documents. The minutes show it passed as part of the consent agenda, which means a high-dollar, long-term property-rights decision was handled in a bundled vote with no separate debate recorded.
Council adopted a broad update to the city’s master fee schedule, including increases to some fees, changes to short-term rental licensing, a new harbor sludge tipping fee that can be charged to the Army Corps of Engineers, and a restructuring of building permit fees. The Council added an amendment capping inspection fees at $2,500 for residential projects and $100,000 for commercial projects—an important guardrail, but also a sign the original structure raised enough concern to need limits before passage.
Staff reported 2025 room-tax revenue was significantly below what was budgeted, with the slide starting in April. They pointed to the NFL Draft as an example of an event expected to boost bookings that didn’t materialize for Two Rivers, and said they’re tracking events to improve future budgeting. The reserve fund was forecast to end 2025 at $62,299—below the commission’s $90,000 goal—so the commission expects to revisit 2026 budget adjustments at the Q1 2026 meeting.
The committee discussed confusion over the 24-hour sidewalk clearing requirement during consecutive snow events—whether the clock restarts, extends, or stacks into multiple violations. Staff described how complaints get logged and forwarded to DPW, but also said DPW doesn’t have immediate resources to chase sidewalk complaints during heavy operations. The discussion also included a staffing reality check: a full plow ideally needs 12 staff (or 14 with windrow cleanup), but the city completed the Sunday plow with eight people, and a key loader broke down with a possible $50,000 engine replacement.
Staff laid out a “challenging” 2026 budget with real service-level consequences: overtime reductions, fewer part-time hours for plowing and leaf collection help, and the Snow Watch program ending in 2026. They also warned of reduced funding for concrete/asphalt patching and winter supplies (salt/sand), and said the city will need close monitoring to avoid surprises. This is the kind of slow-burn cutback residents feel later—when response times slip and small repairs get deferred.
DPW said it intends to bid the mill-and-pave work early in 2026 so construction can start soon after remaining east-side lead service lateral work is finished. The sequencing matters: the city is trying not to pave streets and then cut them back open for utility work. Residents on these streets should watch for timing and coordination as the lead service work wraps up.
Staff reported that bid documents and specifications for the shop roof repair/replacement are still not done. This is a basic project-management bottleneck: until the bid package exists, the city can’t competitively price the work or schedule it. No next deadline or action plan was recorded in the minutes.
Council chose the operating plan that keeps the concession stand city-run but adds beer sales, expands the menu, and uses paid beach parking, with revenue split between special events and the General Fund. This is a policy choice, not just a business tweak: it changes the feel of the beach experience and adds enforcement and management questions the city will have to answer. It passed 6-3, a clearer sign of disagreement than the renovation vote, and residents raised liability and “what kind of beach town are we becoming?” concerns in public comment.
Council directed staff to proceed with a major renovation plan capped at $520,000, including up to $256,000 in city borrowing and an estimated city tax investment capped at $131,000 after room tax contributions. The city described this as a “middle ground” that keeps the building’s footprint and style while expanding restrooms and improving the space, but residents raised sharp concerns about cost, timing, and whether the public had a real say before the project was put on the budget track. The vote was 8-1, showing the council was mostly aligned even with visible public pushback.
Council adopted the full 2026 budget totaling $41.7 million in appropriations. This vote locks in the spending plan that residents were arguing about during public comment—especially around the beach concession stand and cemetery flowers. The budget passed 9-0, which makes the earlier public frustration more pointed: residents showed up in force, but the final budget vote still landed unanimously.
Council voted to use all allowable unused levy capacity from the prior year for the 2026 budget. This is one of those technical steps that can still hit residents’ wallets because it affects how much the city can collect under state levy limits. It passed overwhelmingly, meaning the council largely agreed on maximizing the city’s available levy authority for 2026.
Council adopted the city’s 2026 tax levy at $5,745,073, a 4.05% increase, with two members voting no. The summary also lists other taxing jurisdictions, but this vote is about the city’s own levy decision and the direction of city spending. The split vote suggests residents should expect continued debate about how much the city is taking on—especially with big-ticket projects also moving forward.
Council voted to fund the cemetery perpetual flowers program for 2026, but the meeting record shows a mismatch between the written summary (city share plus crowdfunding) and the motion that passed (approving $6,000 in the 2026 budget). That kind of inconsistency matters because residents are being asked to trust a “transition plan” while the numbers and commitments shift in real time. Public comment made clear many families view this as a promise the city shouldn’t walk away from without a clearer, longer runway.
Council approved the 2026 BID assessment rate at $1.77 per $1,000 of assessed value. The BID also signaled it may revisit the district boundaries in May 2026 for the first time since 1996, which could shift who pays and who benefits downtown. That boundary review is where the real stakes are, and residents and property owners should watch for how the city and BID justify any expansion or reshaping.
Council changed the polling place for Wards 6, 7, and 8 from Abundant Life Church to the Hamilton Wood Type & Printing Museum and updated ward legal descriptions. Polling place changes can confuse voters if outreach isn’t strong, so residents in those wards should double-check where to go before the next election. The vote was unanimous, but the real test is whether the city communicates the change clearly and early.
Council approved a conditional use permit tied to Starbucks at 1509 Washington Street, described as a change in ownership (FrontView REIT) rather than a change in how the site operates. Even when nothing “changes,” these approvals are how the city keeps drive-through uses formally authorized and transferable. Residents who care about traffic and site design should watch how often these permits get treated as routine paperwork.